title: Battery Energy Storage Systems
…164 unchanged lines
# Environmental and Service Conditions {toc}
−## BESS performance is bounded by cell operating temperature; thermal management shall hold cells within the range that preserves both safety and warranted life. {note}
+## BESS performance is bounded by cell operating temperature; thermal management shall hold cells within the range that preserves both safety and warranted life.
## The system shall remain within the charge and discharge temperature limits established by the manufacturer for the selected chemistry, and thermal management shall maintain cell temperature within the optimal life range during normal operation.
…7 unchanged lines
step: 1
setpoints:
+ - 10
- 15
- 35
+ - 40
```
…26 unchanged lines
## Battery racks, cabinets, and containers shall be anchored to resist seismic forces for the project Seismic Design Category in accordance with ASCE 7.
−## Seismic anchorage shall not be assumed to be covered by the packaged-system listing; project-specific anchorage to the structure or foundation shall be engineered and stamped. {note}
+## Seismic anchorage shall not be assumed to be covered by the packaged-system listing; project-specific anchorage to the structure or foundation shall be engineered and stamped.
```datasheet
…13 unchanged lines
# System Sizing and Performance {toc}
−## Energy capacity shall be specified as usable energy at rated power and at the design ambient temperature, never as nameplate energy, to prevent undersizing. {note}
+## Energy capacity shall be specified as usable energy at rated power and at the design ambient temperature, never as nameplate energy, to prevent undersizing.
## The specified energy capacity shall be the usable energy delivered at rated discharge power and design temperature.
…7 unchanged lines
step: 10
setpoints:
+ - 10
- 250
- 500
- 1000
- 2000
+ - 4000
```
−## Continuous power rating shall be specified independently of energy capacity, because the two together define the discharge duration and the application fit. {note}
+## Continuous power rating shall be specified independently of energy capacity, because the two together define the discharge duration and the application fit.
## The continuous discharge and charge power rating shall match the PCS capacity and the executed utility interconnection agreement.
…7 unchanged lines
step: 5
setpoints:
+ - 5
- 100
- 250
- 500
```
−## Both energy (kWh) and power (kW) shall be stated for the system; a duration stated alone is insufficient because the C-rate is undefined without both. {note}
+## Both energy (kWh) and power (kW) shall be stated for the system; a duration stated alone is insufficient because the C-rate is undefined without both.
## The discharge duration shall be specified as the ratio of usable energy to continuous power.
…9 unchanged lines
```
−## Projects pursuing the IRA Section 48E Investment Tax Credit as standalone storage shall provide at least 2-hour discharge duration to qualify. {note}
+## Projects pursuing the IRA Section 48E Investment Tax Credit as standalone storage shall provide at least 2-hour discharge duration to qualify.
## Round-trip efficiency shall be specified as AC-to-AC at rated power and design temperature.
…9 unchanged lines
- 92
- 94
+ - 95
```
−## The usable depth of discharge shall be specified for the capacity calculation; the operating state-of-charge window may be narrower than the usable range for daily cycling. {note}
+## The usable depth of discharge shall be specified for the capacity calculation; the operating state-of-charge window may be narrower than the usable range for daily cycling.
## The system shall deliver the specified usable capacity at the stated minimum depth of discharge at rated power.
…9 unchanged lines
```
−## The voltage class shall be specified because it governs NEC applicability and PCS topology; systems over 1000 V dc invoke NEC Article 710 in addition to Article 706. {note}
+## The voltage class shall be specified because it governs NEC applicability and PCS topology; systems over 1000 V dc invoke NEC Article 710 in addition to Article 706.
```datasheet
…24 unchanged lines
## BMS and EMS communications interfaces shall implement documented cybersecurity provisions consistent with IEEE 2686-2024.
−## The communications protocol shall be selected for interoperability with the project EMS, SCADA, and any utility DERMS platform. {note}
+## The communications protocol shall be selected for interoperability with the project EMS, SCADA, and any utility DERMS platform.
```datasheet
…9 unchanged lines
```
−## The end-of-warranty capacity retention shall be specified as a minimum percentage of nameplate after the warranted cycle count; 80% is preferred for projects with critical resiliency requirements. {note}
+## The end-of-warranty capacity retention shall be specified as a minimum percentage of nameplate after the warranted cycle count; 80% is preferred for projects with critical resiliency requirements.
```datasheet
…17 unchanged lines
step: 100
setpoints:
+ - 500
- 1500
- 4000
- 6000
```
−## The minimum calendar life shall be specified; 15 years is the minimum for utility-interactive projects. {note}
+## The minimum calendar life shall be specified; 15 years is the minimum for utility-interactive projects.
```datasheet
…13 unchanged lines
## The PCS shall be a listed, utility-interactive (or stand-alone, as specified) bidirectional inverter sized not less than the specified continuous power rating.
−## The coupling topology shall be selected based on whether the BESS is paired with new or existing PV and whether a shared DC bus is required. {note}
+## The coupling topology shall be selected based on whether the BESS is paired with new or existing PV and whether a shared DC bus is required.
```datasheet
…8 unchanged lines
## Where AC-coupled with an existing PV inverter, anti-islanding settings of both inverters shall be coordinated so that island detection operates correctly without nuisance trips.
−## The grid-interactive operating mode shall be specified because it governs the IEEE 1547 interconnection category and the required protection. {note}
+## The grid-interactive operating mode shall be specified because it governs the IEEE 1547 interconnection category and the required protection.
```datasheet
…11 unchanged lines
## Utility-interactive systems shall provide configurable Volt-Var and Freq-Watt grid-support functions.
−## The IEEE 1547 performance category shall be specified to match the utility interconnection requirements; Category B is the default for most commercial utility-interactive BESS. {note}
+## The IEEE 1547 performance category shall be specified to match the utility interconnection requirements; Category B is the default for most commercial utility-interactive BESS.
```datasheet
…11 unchanged lines
## DC battery cabling routed through spaces outside the ESS room or enclosure shall be installed in conduit with fault-current and arc-flash coordination per NEC Article 706.
−## An executed utility interconnection agreement and permission to operate (PTO) shall be a precondition to commissioning the BESS. {note}
+## An executed utility interconnection agreement and permission to operate (PTO) shall be a precondition to commissioning the BESS.
## Commissioning of the utility-interactive BESS shall not proceed until utility permission to operate has been granted.
…13 unchanged lines
## Indoor ESS rooms shall be provided with automatic sprinkler protection in accordance with NFPA 13, at a density established by the UL 9540A test data for the installed cell.
−## The fire suppression system type and quantity shall be coordinated with the UL 9540A thermal runaway test report for the specific cell chemistry, and shall not be sized by generic calculation. {note}
+## The fire suppression system type and quantity shall be coordinated with the UL 9540A thermal runaway test report for the specific cell chemistry, and shall not be sized by generic calculation.
```datasheet
…20 unchanged lines
```
−## Outdoor BESS units shall be separated from each other, from exposures, and from lot lines per the UL 9540A test report; where the test data does not qualify a closer spacing, the minimum separation shall be 10 ft (3 m). {note}
+## Outdoor BESS units shall be separated from each other, from exposures, and from lot lines per the UL 9540A test report; where the test data does not qualify a closer spacing, the minimum separation shall be 10 ft (3 m).
```datasheet
…19 unchanged lines
## A factory acceptance test (FAT) shall be performed and documented prior to shipment, and shall verify capacity at rated power to not less than the specified usable kWh, BMS alarm and protection functions, ESD operation, and communications protocol.
−## A site acceptance test (SAT) shall be performed at commissioning and shall include a capacity test, protection relay coordination verification per IEEE 1547, and a fire and gas detection functional test.
−
−## The site acceptance test shall be witnessed by an independent third party; vendor self-certification of commissioning shall not be accepted in lieu of independent witnessing.
−
−## Independent third-party SAT witnessing is commonly a condition of IRA Section 48E and state incentive programs, and documenting it protects both code compliance and incentive eligibility. {note}
−
```datasheet
label: Capacity test acceptance threshold (% of specified usable kWh)
…6 unchanged lines
```
+## A site acceptance test (SAT) shall be performed at commissioning and shall include a capacity test, protection relay coordination verification per IEEE 1547, and a fire and gas detection functional test.
+
+## The site acceptance test shall be witnessed by an independent third party; vendor self-certification of commissioning shall not be accepted in lieu of independent witnessing.
+
+## Independent third-party SAT witnessing is commonly a condition of IRA Section 48E and state incentive programs, and documenting it protects both code compliance and incentive eligibility. {note}
+
# Installation {toc}
…40 unchanged lines
# Spare Parts {toc}
−## Recommended spare parts and consumables shall be furnished to support first-line maintenance without extended downtime. {note}
+## Recommended spare parts and consumables shall be furnished to support first-line maintenance without extended downtime.
## The Contractor shall furnish the manufacturer's recommended spare parts, including spare modules, BMS components, cooling system consumables, and fire suppression agent or cylinders as applicable.
…9 unchanged lines
- Spare fuses and overcurrent devices
```