Below-Grade Waterproofing

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +2 −2

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Below-Grade Waterproofing.
Tag changes −Below Grade−Concrete−Foundations−Slabs−Waterproofing
---
title: Below-Grade Waterproofing
177 unchanged lines
label: Design Groundwater Elevation
type: text
drawing_ref: true
default: "Per geotechnical report — see civil drawings"
+drawing_ref: "geotechnical report"
+default: deferred
```
983 unchanged lines
## Backfilling before flood test and ELD is the single most damaging construction sequencing error in below-grade waterproofing because it converts a correctable deficiency into an excavation-and-reconstruction problem. {note}