Building Thermal Insulation

Read revision 10

Revision 10 · Sep 16, 2026 +2 −1

Content update
Showing changes from Rev 9 to Rev 10 in Building Thermal Insulation.
---
title: Building Thermal Insulation
…1509 unchanged lines
- "Blocking and backing for cladding attachment in place"
- "Openings framed, flashed, and ready to receive the insulation transition"
−default: "Framing complete, plumb, and at the spacing shown"
+default:
+ - "Framing complete, plumb, and at the spacing shown"
```
…192 unchanged lines
### Where the as-built assemblies differ from those on which the compliance documentation was based, the Contractor shall report the difference and shall obtain a revised compliance evaluation from the party responsible for the energy analysis before requesting final acceptance.