Control Systems Integration and Testing
Tag-only update
Showing changes from Rev 1
to Rev 2
in Control Systems Integration and Testing.
Tag changes
+Acceptance Testing+Commissioning+Controls+Functional Testing+Industrial+Instrumentation+SCADA+Sequence of Operations+Startup+Wastewater Treatment+Water Treatment
---
title: Control Systems Integration and Testing
…620 unchanged lines
default: [Licensed development/configuration software for controllers and SCADA, Source configuration for every controller program, Source configuration for the SCADA/HMI application and graphics, Documented backup/restore procedure and verified backup media]
```