Control Systems Integration and Testing
Datasheet constraints: every range, checkbox and listbox field now states its direction
Showing changes from Rev 4
to Rev 5
in Control Systems Integration and Testing.
---
title: Control Systems Integration and Testing
…104 unchanged lines
- "Site test, loop check, performance verification, and endurance test plans"
- "Training plan"
+constraint: all_of
```
…26 unchanged lines
- "Cybersecurity configuration record"
- "Factory acceptance test simulation description"
+constraint: all_of
```
…44 unchanged lines
- "Training records"
- "Owner receipt for software and source configuration"
+constraint: all_of
```
…10 unchanged lines
max: 90
setpoints: [0, 14, 30, 45, 60, 90]
+constraint: max
```
…5 unchanged lines
```datasheet
−label: Minimum Integrator Experience
+label: Integrator Experience
type: range
unit: years
…3 unchanged lines
setpoints: [0, 2, 3, 5, 10, 15]
default: 5
+constraint: min
```
…14 unchanged lines
- "Current manufacturer certification on the SCADA platform"
- "Comparable-project references"
+constraint: all_of
```
…3 unchanged lines
```datasheet
−label: Minimum Comparable-Project References
+label: Comparable-Project References
type: range
unit: references
…3 unchanged lines
setpoints: [1, 2, 3, 5, 10]
default: 3
+constraint: min
```
…183 unchanged lines
- "Failure response on loss of signal, power, and communications"
- "Adjustable parameters listed with initial values"
+constraint: all_of
```
…26 unchanged lines
- "Local at the field device or local control station"
- "Off or locked out"
+constraint: all_of
```
…83 unchanged lines
- "Completion of the site acceptance test"
- "Substantial completion"
+constraint: all_of
```
…83 unchanged lines
- "Principal setpoints the plant is permitted to command"
- "Runtime and cycle counts"
+constraint: all_of
```
…148 unchanged lines
setpoints: [7, 10, 14, 21, 30]
default: 14
+constraint: min
```
…42 unchanged lines
- "Alarm generation against the rationalized alarm list"
- "Packaged subsystem interfaces by simulation"
+constraint: all_of
```
…11 unchanged lines
setpoints: [10, 25, 50, 100]
default: 100
+constraint: min
```
…42 unchanged lines
- "Valve and actuator stroke record"
- "Fail-safe position verification record"
+constraint: all_of
```
…10 unchanged lines
max: 100
setpoints: [0, 10, 25, 50, 100]
+constraint: min
```
…46 unchanged lines
max: 60
setpoints: [0, 3, 7, 14, 30, 60]
+constraint: min
```
…52 unchanged lines
- "Maintenance training on the I/O list, loop diagrams, and troubleshooting"
- "Configuration management and backup and restore training"
+constraint: all_of
```
…10 unchanged lines
max: 80
setpoints: [0, 4, 8, 16, 24, 40, 80]
+constraint: min
```
…10 unchanged lines
max: 80
setpoints: [0, 4, 8, 16, 24, 40, 80]
+constraint: min
```
…23 unchanged lines
setpoints: [1, 2, 3]
default: 1
+constraint: min
```
…12 unchanged lines
max: 72
setpoints: [2, 4, 8, 24, 48, 72]
+constraint: max
```
…25 unchanged lines
- "Source configuration for the SCADA application and graphics"
- "Verified backup media with the documented restore procedure"
+constraint: all_of
```
…5 unchanged lines
## A compiled runtime without the source configuration leaves the Owner unable to make even a trivial change, and a source file stripped of its comments leaves the next engineer reverse-engineering the plant's own logic; the controlled, documented source is the deliverable that makes the system the Owner's. {note}