title: Electric Heat Tracing
…9 unchanged lines
heating of long transmission pipelines, snow-melt slab heating embedded in
concrete, or space heating. Pipe insulation systems are specified in
− [[syncs/mechanical-insulation]].
+ [[sync/mechanical-insulation]].
---
…12 unchanged lines
### All heating cable, accessories, and controls within a single circuit shall be products of one manufacturer's listed system.
−### Pipe insulation, jacketing, and weather barrier required over traced piping are specified in [[syncs/mechanical-insulation]] and are coordinated with, but not furnished under, this standard.
+### Pipe insulation, jacketing, and weather barrier required over traced piping are specified in [[sync/mechanical-insulation]] and are coordinated with, but not furnished under, this standard.
# Referenced Standards {toc}
…299 unchanged lines
### A continuous metallic braid is required by NEC Article 427 to provide an equipment grounding path along the cable and to serve as the reference for ground-fault sensing; it shall not be omitted. {note}
−### Every heating cable shall have a continuous metallic braid bonded to the equipment grounding system in accordance with [[syncs/grounding-and-bonding]].
+### Every heating cable shall have a continuous metallic braid bonded to the equipment grounding system in accordance with [[sync/grounding-and-bonding]].
# Maximum Circuit Length and Overcurrent Protection {toc}
…169 unchanged lines
### High-temperature self-regulating or constant-wattage cable shall not be applied to CPVC, PEX, or other thermoplastic pipe without confirming the cable surface temperature stays within the pipe rating.
−### Freeze protection of domestic water piping shall be coordinated with [[syncs/domestic-water-piping]], and freeze protection of hydronic piping with [[syncs/hydronic-piping]].
+### Freeze protection of domestic water piping shall be coordinated with [[sync/domestic-water-piping]], and freeze protection of hydronic piping with [[sync/hydronic-piping]].
```datasheet
…141 unchanged lines
### No section of pipe insulation shall be installed over a heating circuit that has not passed its pre-insulation insulation-resistance test.
−### The insulation, jacketing, and weather barrier installed over the traced pipe shall comply with [[syncs/mechanical-insulation]] and shall maintain a continuous weather seal so the cable stays dry.
+### The insulation, jacketing, and weather barrier installed over the traced pipe shall comply with [[sync/mechanical-insulation]] and shall maintain a continuous weather seal so the cable stays dry.
# Delivery, Storage, and Handling {toc}
…52 unchanged lines
default: 25
```