Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Emergency and Standby Power Systems.
Tag changes −Acceptance Testing−Emergency Power−NEC−NFPA 110−Standby Power
---
title: Emergency and Standby Power Systems
513 unchanged lines
type: text
drawing_ref: true
default: "As indicated on the drawings (typically fire command center or 24-hour monitored station)"
+default: deferred
```
121 unchanged lines
## Coverage shall extend to defects in materials and workmanship and to the system's failure to meet its commissioned transfer times under normal standby use.