Entrance Flooring and Walk-Off Systems

Revision 3 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 8, 2026 +0 −0

Tag-only update
Showing changes from Rev 2 to Rev 3 in Entrance Flooring and Walk-Off Systems.
Tag changes +ADA+Flooring
---
title: Entrance Flooring and Walk-Off Systems
595 unchanged lines
## Failures arising from a recess formed to the wrong depth or without required drainage, from loads exceeding the grille's rated rolling load, or from maintenance contrary to the manufacturer's instructions are excluded.

View current revision