Entrance Flooring and Walk-Off Systems

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +1 −1

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Entrance Flooring and Walk-Off Systems.
Tag changes −ADA−Flooring
---
title: Entrance Flooring and Walk-Off Systems
384 unchanged lines
type: text
drawing_ref: true
default: "As shown on the finish plan — full entrance width, total walk-off length per the specified zone arrangement"
+default: deferred
```
206 unchanged lines
## Failures arising from a recess formed to the wrong depth or without required drainage, from loads exceeding the grille's rated rolling load, or from maintenance contrary to the manufacturer's instructions are excluded.

View current revision