Membrane Roofing

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +2 −3

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Membrane Roofing.
Tag changes −Insulation−Roofing−Vapor Barriers−Wind Load Resistance
---
title: Membrane Roofing
691 unchanged lines
- "12 in o.c. (standard commercial)"
- "18 in o.c."
- "Per FM RoofNav listing — see drawings"
default: "Per FM RoofNav listing — see drawings"
+default: deferred
```
118 unchanged lines
type: radio
unit: in
+drawing_ref: "roof drawings"
options:
- "8 in (minimum)"
- "12 in (preferred; high-snow or high-debris environments)"
- "Greater than 12 in — per drawings"
default: "8 in (minimum)"
```
513 unchanged lines
### The plasticizer from the PVC migrates into the bituminous facer, stiffening the membrane, causing brittleness, and ultimately cracking. {note}
### Material compatibility confirmation between the membrane, adhesive, and cover board is a required submittal item and must be documented before installation begins.