Metal Roof Panels

Revision 2 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 12, 2026 +3 −3

Fix cross-reference library prefix syncs/ -> sync/
Showing changes from Rev 1 to Rev 2 in Metal Roof Panels.
---
title: Metal Roof Panels
15 unchanged lines
## Panel-integrated flashing, eave, rake, ridge, valley, and penetration trim are within scope. This standard does not cover the following, which are coordinated with this section but specified elsewhere: {note}
- Stand-alone custom sheet metal work, gutters, copings, and trim furnished as a separate scope — see [[syncs/sheet-metal-flashing-and-trim]].
- Roof thermal insulation and air/vapor control layers — see [[syncs/building-thermal-insulation]].
- Vertical metal wall cladding and matching wall panels — see [[syncs/metal-wall-panels]].
+- Stand-alone custom sheet metal work, gutters, copings, and trim furnished as a separate scope — see [[sync/sheet-metal-flashing-and-trim]].
+- Roof thermal insulation and air/vapor control layers — see [[sync/building-thermal-insulation]].
+- Vertical metal wall cladding and matching wall panels — see [[sync/metal-wall-panels]].
# Referenced Standards {toc}
711 unchanged lines
- Touch-up coating
```

View current revision