Natural Stone Tile
Datasheet constraints: every range, checkbox and listbox field now states its direction
Showing changes from Rev 8
to Rev 9
in Natural Stone Tile.
---
title: Natural Stone Tile
…114 unchanged lines
- "Shop drawings for layout, vein match, movement joints, and edge profiles"
- "Installer qualification documentation for the stone and method"
+constraint: all_of
```
…22 unchanged lines
- "Maintenance instructions with permitted and prohibited cleaning agents"
- "Attic-stock transmittal with quantity, stone, finish, size, and lot"
+constraint: all_of
```
…87 unchanged lines
```datasheet
−label: Minimum Ambient and Substrate Temperature During Setting and Cure
+label: Ambient and Substrate Temperature During Setting and Cure
type: range
unit: °F
…2 unchanged lines
step: 5
default: 50
+constraint: min
```
…8 unchanged lines
```datasheet
−label: Maximum Substrate Relative Humidity (ASTM F2170)
+label: Substrate Relative Humidity (ASTM F2170)
type: range
unit: '%'
min: 60
max: 100
step: 5
+constraint: max
```
…139 unchanged lines
```datasheet
−label: Minimum Abrasion Hardness (Ha) of Floor Stone
+label: Abrasion Hardness (Ha) of Floor Stone
type: range
min: 8
max: 30
step: 1
+constraint: min
```
…5 unchanged lines
```datasheet
−label: Minimum Dynamic Coefficient of Friction (ANSI A326.3)
+label: Dynamic Coefficient of Friction (ANSI A326.3)
type: range
unit: DCOF
…2 unchanged lines
setpoints: [0.30, 0.35, 0.42, 0.50, 0.60, 0.70, 0.80]
default: 0.42
+constraint: min
```
…49 unchanged lines
max: 3
step: 0.0625
+constraint: exact
```
…261 unchanged lines
max: 0.75
step: 0.03125
+constraint: exact
```
…30 unchanged lines
step: 1
default: 25
+constraint: max
```
…8 unchanged lines
step: 1
default: 12
+constraint: max
```
…196 unchanged lines
max: 25
setpoints: [1, 2, 5, 10, 15, 25]
+constraint: min
```
…9 unchanged lines
step: 1
default: 1
+constraint: min
```
…15 unchanged lines
max: 10
step: 1
+constraint: min
```
## Spare stone shall be delivered in full crates labeled with the stone, the finish, the size, and the block or lot.
## Spare stone shall be stored where the Owner directs, in a dry, protected location and on non-staining dunnage.