Showing changes from Rev 3 to Rev 4 in Plumbing Insulation.
Tag changes −ADA−Domestic Water−Hot Water−Insulation−Plumbing−Storm Drainage
---
title: Plumbing Insulation
424 unchanged lines
label: ADA Covers Required At
type: select
+drawing_ref: "plumbing fixture plans and accessibility schedule"
options:
- "All accessible lavatories and sinks per the accessibility schedule"
- "As indicated on the drawings"
default: "All accessible lavatories and sinks per the accessibility schedule"
```