Post-Tensioned Concrete

Revision 5 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +9 −11

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 4 to Rev 5 in Post-Tensioned Concrete.
Tag changes −Cast-in-Place Concrete−Concrete−Parking Structure−Post-Tensioning−Structural
---
title: Post-Tensioned Concrete
427 unchanged lines
label: Tendon Profile Source
type: radio
options:
- "As shown on the structural and placing drawings (high/low points and support heights)"
default: "As shown on the structural and placing drawings (high/low points and support heights)"
+drawing_ref: "structural and placing drawings"
+default: deferred
```
103 unchanged lines
label: Jack and Gauge Calibration
type: radio
+drawing_ref: "supplier's quality-control plan"
options:
- "Calibrated as a unit by accredited lab, within validity period (standard)"
- "Per supplier's quality-control plan and applicable PTI specification"
default: "Calibrated as a unit by accredited lab, within validity period (standard)"
```
10 unchanged lines
label: Stressing Sequence Basis
type: radio
+drawing_ref: "placing drawings and stressing procedure"
options:
- "Per the accepted placing drawings and stressing procedure (standard)"
- "Engineer-directed sequence for staged or transfer construction"
default: "Per the accepted placing drawings and stressing procedure (standard)"
+default: deferred
```
171 unchanged lines
label: Anchorage Zone Reinforcement
type: radio
+drawing_ref: "supplier's qualified anchorage detail and placing drawings"
options:
- "Per supplier's qualified anchorage detail and placing drawings (standard)"
- "Per Engineer of Record's anchorage zone design"
default: "Per supplier's qualified anchorage detail and placing drawings (standard)"
+default: deferred
```
15 unchanged lines
label: Anchorage Location and Angularity
type: radio
options:
- "Per supplier's installation tolerance and placing drawings (standard)"
default: "Per supplier's installation tolerance and placing drawings (standard)"
+drawing_ref: "supplier's installation tolerance and placing drawings"
+default: deferred
```
95 unchanged lines
### The warranty shall not limit the Engineer's right to require corrective work for nonconforming conditions discovered during the warranty period.

View current revision