Short-Circuit Study
Content update
Showing changes from Rev 7
to Rev 8
in Short-Circuit Study.
---
title: Short-Circuit Study
…235 unchanged lines
- "Three-phase fault — interrupting (1.5 to 4 cycles)"
- "Three-phase fault — time-delayed (30 cycles, where applicable)"
−default: "Three-phase bolted fault (symmetrical, maximum)"
+default:
+ - "Three-phase bolted fault (symmetrical, maximum)"
```
…441 unchanged lines
## The errata period covers correction of calculation errors and reporting errors identified after delivery; it does not cover updates required by system changes, utility changes, or other re-study triggers, which are separately commissioned re-studies. {note}