---
title: Soil Stabilization and Modification
…486 unchanged lines
### The finished elevation and tolerance of the treated layer shall be coordinated with the overlying course requirements of [[sync/aggregate-base-course]] or [[sync/asphalt-paving]] so that the design section thickness is preserved.
−
−## This SynC standard is licensed under CC BY-SA 4.0. It was independently authored from public consensus standards, public government guide criteria, building codes, and professional engineering knowledge. {note}