Soil Stabilization and Modification

Read revision 4

Revision 4 · Aug 26, 2026 +15 −7

Corpus sync: neutrality remakes, note hygiene, datasheet relocation, transformer-split cross-refs
Showing changes from Rev 3 to Rev 4 in Soil Stabilization and Modification.
---
title: Soil Stabilization and Modification
70 unchanged lines
# Submittals {toc}
## Action submittals establish what the Contractor proposes to furnish and shall be reviewed before any binder is delivered to the site. {note}
+## Action submittals establish what the Contractor proposes to furnish and shall be reviewed before any binder is delivered to the site.
### The Contractor shall submit the following action submittals for review before delivery of binder materials:
38 unchanged lines
- Density gauge and spreader calibration records
- Daily treatment records
default: [Geotechnical report excerpts (goal, binder, rate, depth), Binder safety data sheets, Daily treatment records]
+default:
+ - "Geotechnical report excerpts (goal, binder, rate, depth)"
+ - "Binder safety data sheets"
+ - "Daily treatment records"
```
14 unchanged lines
- Field pH verification records (lime treatment)
- As-treated plan (limits, depth, binder)
default: [Field density and moisture reports, Field pH verification records (lime treatment), As-treated plan (limits, depth, binder)]
+default:
+ - "Field density and moisture reports"
+ - "Field pH verification records (lime treatment)"
+ - "As-treated plan (limits, depth, binder)"
```
44 unchanged lines
## The treated layer shall be cured to retain moisture for the reaction, and the curing method shall be selected for the treatment type and climate.
### Cement-stabilized layers lose surface strength and crack if they dry before the reaction completes; a curing membrane or continuous moist curing protects the surface until an overlying course is placed. {note}
```datasheet
label: Curing Method
6 unchanged lines
```
+### Cement-stabilized layers lose surface strength and crack if they dry before the reaction completes; a curing membrane or continuous moist curing protects the surface until an overlying course is placed. {note}
+
+### The minimum cure period before placing the overlying course shall be specified for the treatment type and climate.
+
```datasheet
label: Minimum Cure Before Placing Overlying Course
55 unchanged lines
```
## Fly ash is used standalone (Class C, which is self-cementing) or as a Class F plus lime blend (Class F is not self-cementing and must be activated by lime). Class F plus lime blends shall be designed in the laboratory because the proportions are not fixed. {note}
+## Fly ash is used standalone (Class C, which is self-cementing) or as a Class F plus lime blend (Class F is not self-cementing and must be activated by lime). Class F plus lime blends shall be designed in the laboratory because the proportions are not fixed.
### Class C fly ash treatment rate shall be as established by the mix design, between 8 and 16 percent by dry soil weight.
86 unchanged lines
```
## Lift thickness is limited by the depth a single mixing pass can treat uniformly. A single lift is typically 6 to 12 in.; treatment deeper than the single-pass capacity shall be performed in two lifts. {note}
+## Lift thickness is limited by the depth a single mixing pass can treat uniformly. A single lift is typically 6 to 12 in.; treatment deeper than the single-pass capacity shall be performed in two lifts.
### Each treated lift shall be at least 6 in. (150 mm) and shall not exceed the depth the selected mixing equipment can pulverize and blend uniformly in a single pass, typically 12 to 14 in. (305 to 355 mm).
138 unchanged lines
### The finished elevation and tolerance of the treated layer shall be coordinated with the overlying course requirements of [[sync/aggregate-base-course]] or [[sync/asphalt-paving]] so that the design section thickness is preserved.