Steel Deck

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 8, 2026 +0 −0

Tag-only update
Showing changes from Rev 3 to Rev 4 in Steel Deck.
Tag changes +Concrete+Connections+Flooring+Framing+Roofing+Slabs+Steel+Structural
---
title: Steel Deck
1004 unchanged lines
## The Contractor's warranty shall not limit the SER's right to require corrective work for nonconforming conditions discovered during the warranty period, including conditions concealed by subsequent work that are exposed during routine maintenance or alteration.

View current revision