# Environmental and Service Conditions {toc}
## Temporary facilities shall be selected and rated for the climate zone, exposure, and duration of the project, including wind, snow, and temperature extremes anticipated during the construction period. {note}
+## Temporary facilities shall be selected and rated for the climate zone, exposure, and duration of the project, including wind, snow, and temperature extremes anticipated during the construction period.
## Equipment installed outdoors shall be rated for wet locations; electrical enclosures shall be NEMA 3R at minimum, and NEMA 4X where exposed to corrosive or marine atmospheres.
123 unchanged lines
# Temporary Water {toc}
## The potable-water source shall be as selected below; a municipal tap-in is preferred where available because it avoids recurring delivery cost and supports hand-washing and dust control. {note}
+## The potable-water source shall be as selected below; a municipal tap-in is preferred where available because it avoids recurring delivery cost and supports hand-washing and dust control.
```datasheet
57 unchanged lines
# Temporary Enclosures {toc}
## Temporary enclosures weatherproof in-progress work and contain temporary heat; the enclosure type must match the work being protected, particularly cold-weather concrete cure. {note}
+## Temporary enclosures weatherproof in-progress work and contain temporary heat; the enclosure type must match the work being protected, particularly cold-weather concrete cure.
## Temporary enclosures shall be the type selected below and shall be secured against wind uplift and tear-away.
237 unchanged lines
## Demobilization sequencing and final punch-list administration shall be coordinated with [[sync/closeout-procedures]].