Testing, Adjusting, and Balancing for HVAC

Read revision 8

Revision 8 · Sep 16, 2026 +4 −2

Content update
Showing changes from Rev 7 to Rev 8 in Testing, Adjusting, and Balancing for HVAC.
---
title: Testing, Adjusting, and Balancing for HVAC
…198 unchanged lines
- "Controls override available to TAB Contractor"
- "Building envelope substantially closed"
−default: "Ductwork complete, pressure-tested where required"
+default:
+ - "Ductwork complete, pressure-tested where required"
```
…391 unchanged lines
- "Automatic flow-limiting cartridge valve (factory pre-set)"
- "Pressure-independent control valve (PICV) — combines control and balance"
−default: "Manual calibrated balancing valve (double-regulating, with DP ports)"
+default:
+ - "Manual calibrated balancing valve (double-regulating, with DP ports)"
```
…280 unchanged lines
### The TAB Final Report is the baseline against which future re-balance or troubleshooting work is compared, and the Owner shall retain the report as a permanent record of the system as accepted.