1.1This standard covers factory-fabricated variable air volume (VAV) terminal units serving as the primary zone-level airflow control device in central VAV air systems.
NOTEThis standard governs single-duct pressure-independent VAV units (cooling-only and with reheat), parallel fan-powered terminal units, series fan-powered terminal units, and dual-duct VAV units. (1.1.1)
NOTEThe unit assembly covered here comprises the galvanized-steel casing, the modulating primary-air damper and actuator, the multi-point averaging airflow sensor, the acoustic liner, the hydronic or electric reheat coil, the fan and motor assembly on fan-powered types, the integral or remote DDC controller, and the BACnet network interface. (1.1.2)
NOTEThis standard is deliberately VAV-specific and complementary to Air Terminal UnitsAir Terminal UnitsResolves to the current edition.sync/air-terminal-units, which is the broad air-terminal family standard. (1.1.3)
NOTEThe broad family standard carries the general casing construction, materials, and baseline quality-assurance requirements common to all air terminals; this standard goes deeper on the VAV-specific topics: pressure independence, ASHRAE 90.1 Section 6.5.2 reheat and minimum-airflow compliance, static pressure reset participation, ASHRAE Guideline 36 control sequences, and ECM fan motor requirements. (1.1.4)
1.1.5Where this standard and Air Terminal UnitsAir Terminal UnitsResolves to the current edition.sync/air-terminal-units both address a topic, the more stringent or more specific requirement shall govern.
1.1.6VAV terminal units shall be selected, furnished, and installed in accordance with this standard, the contract drawings, and the equipment schedule.
1.2Applications
NOTEThis standard applies to new construction and replacement-in-kind in office buildings, schools, hospitals, laboratories, and similar occupancies where a central air handler delivers conditioned primary air above 0.5 in. w.g. static pressure to a distributed duct system with individual zone temperature control. (1.2.1)
NOTEThe energy-code context is ASHRAE 90.1 Section 6 (VAV reheat limits, minimum airflow setpoints, fan power, and static pressure reset) and ASHRAE 62.1 (minimum part-load ventilation by demand-controlled ventilation or fixed minimums). (1.2.2)
VAV terminal unit typeradio
○ Single-duct cooling-only (no reheat)
● Single-duct with hydronic reheat
○ Single-duct with electric reheat
○ Parallel fan-powered (PFPTU)
○ Series fan-powered (SFPTU)
○ Dual-duct VAV (mixing box)
1.3Exclusions
NOTERoom-boundary outlets — diffusers, grilles, registers, and linear slot outlets — are excluded and are covered by HVAC Air Distribution DevicesHVAC Air Distribution DevicesResolves to the current edition.sync/hvac-air-distribution-devices. (1.3.1)
NOTEThe central air handling unit that generates and distributes the primary air stream is excluded and is covered by Air Handling UnitsAir Handling UnitsResolves to the current edition.sync/air-handling-units. (1.3.2)
NOTEDuctwork and fittings upstream of the inlet collar and downstream of the outlet collar are excluded and are covered by Duct AccessoriesHVAC Duct AccessoriesResolves to the current edition.sync/duct-accessories and the broader ductwork standard. (1.3.3)
NOTEConstant-volume reheat units, dual-duct mixing boxes in non-VAV service, and induction units are excluded and are covered by Air Terminal UnitsAir Terminal UnitsResolves to the current edition.sync/air-terminal-units. (1.3.4)
NOTEFan coil units and chilled beams that recirculate room air rather than meter central primary air are excluded. (1.3.5)
NOTELaboratory venturi-style airflow control valves used for critical pressurization, such as fume hood face-velocity control, are excluded. (1.3.6)
NOTEMakeup air units that supply 100% outdoor air without zone-level damper metering are excluded and are covered by Makeup Air UnitsMakeup Air UnitsResolves to the current edition.sync/makeup-air-units. (1.3.7)
NOTEIn-line sound attenuators installed in ductwork upstream of the terminal unit are excluded and are covered by HVAC Sound AttenuatorsHVAC Sound AttenuatorsResolves to the current edition.sync/hvac-sound-attenuators. (1.3.8)
NOTEHydronic piping serving the reheat coil and condensate drainage from fan-powered cooling coils are excluded and are covered by Hydronic PipingHydronic PipingResolves to the current edition.sync/hydronic-piping and Condensate Drainage PipingHVAC Condensate Drainage PipingResolves to the current edition.sync/condensate-drainage-piping respectively. (1.3.9)
NOTEVariable frequency drives on the central air-handler fan are excluded and are covered by HVAC Variable Frequency DrivesHVAC Variable Frequency DrivesResolves to the current edition.sync/hvac-variable-frequency-drives. (1.3.10)
2Referenced Standards
2.1Equipment, materials, and installation shall comply with the latest adopted edition of each of the following unless a specific edition is cited.
2.2Where referenced standards conflict, the more stringent requirement shall govern unless the Engineer of Record directs otherwise in writing.
Standard
Title
ANSI/AHRI 880-2017 (R2023)
Performance Rating of Air Terminals
ANSI/AHRI 885-2008 (R2021)
Procedure for Estimating Occupied Space Sound Levels in the Application of Air Terminals and Air Outlets
ANSI/ASHRAE 130-2016
Methods of Testing Air Terminal Units
ANSI/ASHRAE/IES 90.1-2022
Energy Standard for Buildings Except Low-Rise Residential Buildings
ANSI/ASHRAE 62.1-2022
Ventilation and Acceptable Indoor Air Quality
ASHRAE Guideline 36-2021
High-Performance Sequences of Operation for HVAC Systems
NFPA 90A-2024
Standard for the Installation of Air-Conditioning and Ventilating Systems
NFPA 70 (NEC)
National Electrical Code (Article 424, Fixed Electric Space-Heating Equipment)
UL 60335-2-40
Safety — Electrically Operated Heat Pumps, Air-Conditioners, and Dehumidifiers
UL 181-2019
Factory-Made Air Ducts and Air Connectors
ASTM C1071-16
Fibrous Glass Duct Lining Insulation (Thermal and Sound Absorbing Material)
ASTM E84-24
Surface Burning Characteristics of Building Materials
SMACNA HVAC Duct Construction Standards (4th ed., 2021)
HVAC Duct Construction Standards — Metal and Flexible
ANSI/NEMA MG 1-2021
Motors and Generators
ANSI/ASHRAE/ACCA 180-2012
Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems
NOTEASHRAE Guideline 36 is a consensus best-practice document, not a mandatory code, but it is the preferred basis for VAV terminal unit control sequences under this standard. (2.3)
3Submittals
3.1Action Submittals
3.1.1The Contractor shall submit the following action submittals for review before fabrication:
Product data for each VAV terminal unit type, including AHRI 880 certified ratings for primary airflow, casing leakage, pressure drop, and sound power
Shop drawings showing casing dimensions, inlet and outlet sizes, service clearances, access locations, and mounting details
Equipment schedule confirming maximum and minimum primary airflow setpoints, inlet size, inlet velocity, and reheat capacity for each tagged unit
Reheat coil performance data: hydronic capacity at scheduled entering water temperature and flow, or electric kW, stages, and sheath material
Fan and ECM motor data for fan-powered units, including watts per CFM at design airflow
DDC controller data sheets, BACnet protocol and profile, point list, and object mapping
Acoustic performance: AHRI 885 occupied-space NC calculation for each representative zone at design conditions
Action submittals requiredcheckbox
☑ AHRI 880 certified product data
☑ Shop drawings with service clearances
☑ Airflow setpoint schedule (max/min/velocity)
☐ Reheat coil performance data
☐ ECM fan/motor watts-per-CFM data
☑ DDC controller data and BACnet point list
☐ AHRI 885 NC acoustic calculation
3.2Informational Submittals
3.2.1The Contractor shall submit the following informational submittals before delivery to the site:
NRTL listing evidence (UL 60335-2-40) for units containing electric heat, motors, or electronic controls
Liner material certification showing ASTM C1071 compliance and ASTM E84 flame-spread/smoke-developed indices
Factory flow-calibration certificate for each unit
Manufacturer's installation, start-up, and balancing instructions
Informational submittals requiredcheckbox
☑ NRTL listing (UL 60335-2-40)
☑ Liner ASTM C1071 / E84 certification
☑ Factory flow-calibration certificate
☐ Installation and start-up instructions
3.3Closeout Submittals
3.3.1The Contractor shall submit the following closeout submittals before substantial completion:
Operation and maintenance manuals covering damper, actuator, reheat coil, fan, and controller service
As-built BACnet point list and final control sequence documentation
Field commissioning and air-balance reports showing achieved maximum and minimum airflow at each unit
Warranty documentation
Closeout submittals requiredcheckbox
☑ O&M manuals
☑ As-built BACnet point list and sequences
☑ Commissioning and air-balance reports
☑ Warranty documentation
4Quality Assurance
4.1Certification
4.1.1Every VAV terminal unit furnished under this standard shall be certified to ANSI/AHRI 880 and shall bear the AHRI certification mark.
NOTEAHRI 880 certified values for primary airflow, casing leakage, pressure drop, and sound power shall be the basis of selection; manufacturer's uncertified ratings shall not be substituted. (4.1.2)
4.1.3Sound performance shall be projected to the occupied space using ANSI/AHRI 885 before the unit selection is finalized.
4.1.4Units containing electric heating elements, motors, or electronically controlled components shall be listed and labeled by a Nationally Recognized Testing Laboratory to UL 60335-2-40.
4.2Manufacturer Qualifications
4.2.1The manufacturer shall have produced AHRI 880 certified VAV terminal units of the specified types for not less than five years.
4.2.2All VAV terminal units on the project shall be the product of a single manufacturer.
NOTEMixing controller makes or models across a single project, without a confirmed BACnet object map for each, drives integration RFIs and programming change orders during controls startup; standardizing on one make avoids this and ensures consistent controller make, BACnet object mapping, and service parts. (4.2.3)
4.3Source Quality Control
4.3.1Each unit shall be flow-calibrated at the factory across its specified airflow range per ANSI/ASHRAE 130.
4.3.2Casing leakage shall be verified at the rated close-off pressure as part of the AHRI 880 certification program.
5Environmental and Service Conditions
5.1Operating Conditions
NOTEVAV terminal units shall be suitable for indoor installation in a conditioned ceiling plenum or above an accessible ceiling, not exposed to weather. (5.1.1)
NOTEUnits shall operate with primary air supplied by the central air handler at static pressure above 0.5 in. w.g. and across the inlet static pressure range scheduled for the project. (5.1.2)
5.1.3The casing and components shall be rated for continuous operation at the supply-air temperature range delivered by the central system, including morning warm-up.
Inlet static pressure operating rangerange
in. w.g.
0.53
Damper close-off pressure ratingselect
4
5
6
5.2Pressure Independence
5.2.1VAV terminal units shall be pressure-independent, with an integral averaging airflow sensor and DDC controller that maintain the commanded airflow setpoint regardless of variations in inlet static pressure.
5.2.2Pressure-dependent units shall not be used in a central VAV system.
NOTEA pressure-dependent unit reads damper position rather than airflow, so it delivers an incorrect, drifting flow whenever system static pressure changes — which in a VAV system is continuous; only pressure-independent control holds the ventilation and load setpoints the design relies on. (5.2.3)
Airflow control moderadio
● Pressure-independent (integral airflow sensor)
○ Pressure-dependent (legacy low-pressure only)
6Unit Sizing and Airflow
6.1Inlet Sizing
NOTEThe unit frame size shall be selected from the maximum primary airflow and inlet velocity, not from the connecting duct size. (6.1.1)
NOTESizing the inlet to match the duct rather than the airflow oversizes the inlet, which drives the airflow sensor below its accurate range at minimum setpoint and produces poor ventilation control and unstable DDC hunting; size to velocity first. (6.1.2)
6.1.3The design inlet velocity shall not exceed 1,200 FPM, and shall not exceed 900 FPM for units whose minimum airflow setpoint is 50% or more of maximum, per ASHRAE 90.1.
Primary inlet diameter (round)select
4
5
6
7
8
9
10
12
14
16
18
20
Maximum primary airflow (design cooling)range
CFM
407000
Design inlet velocity (maximum)range
FPM
6001200
6.2Minimum Airflow Setpoint
6.2.1The minimum primary airflow setpoint shall be the greatest of the ASHRAE 62.1 part-load ventilation requirement, the applicable ASHRAE 90.1 Section 6.5.2.1 reheat minimum, and the manufacturer's published low-flow accuracy limit.
NOTEThe minimum setpoint shall not be set below approximately 10% to 15% of maximum without verifying the manufacturer's published low-flow accuracy data at that flow; setting a minimum below the sensor's reliable range produces unstable readings and ventilation faults that surface only at commissioning. (6.2.2)
Minimum primary airflow setpoint (% of maximum)range
%
1050
6.3ASHRAE 90.1 Reheat Compliance
6.3.1Where reheat is provided, the minimum primary airflow setpoint at which reheat is permitted shall comply with ASHRAE 90.1-2022 Section 6.5.2.1.
6.3.2The permitted minimum for reheat shall be the greater of 20% of the design zone supply airflow, 0.4 CFM/ft² of conditioned floor area, or the minimum required by ASHRAE 62.1.
NOTEThe design documents shall confirm and record the governing reheat minimum for each zone before the setpoints are programmed. (6.3.3)
NOTESpecifying a minimum setpoint lower than ASHRAE 90.1 permits is a code violation that is frequently not caught until commissioning or energy inspection; confirming compliance at design avoids rework. (6.3.4)
ASHRAE 90.1 reheat minimum basisradio
● 20% of design zone supply airflow
○ 0.4 CFM/ft² of conditioned floor area
○ ASHRAE 62.1 minimum ventilation
AHRI 880 primary airflow accuracyradio
● ±10% of setpoint (standard)
○ ±5% of setpoint (labs / critical spaces)
7Casing and Acoustic Construction
7.1Casing
7.1.1The casing shall be galvanized steel of not less than 20 gauge for the body and damper, with reinforced corners and a static pressure class consistent with the supply-air pressure class of the system per the SMACNA HVAC Duct Construction Standards.
7.1.2Inlet and outlet collars shall be round or rectangular as scheduled and shall be sized to suit the connecting ductwork.
7.1.3Casing air leakage at the rated close-off pressure shall not exceed the AHRI 880 leakage class specified below.
7.1.4The casing static pressure class shall be not less than 2 in. w.g.
Casing gauge (galvanized steel)radio
● 20 gauge (standard)
○ 22 gauge
AHRI 880 casing leakage classradio
● Class A (≤ 2% of max airflow)
○ Class B (≤ 5% of max airflow)
Casing cross-sectionradio
● Rectangular (standard)
○ Round
○ Low-profile flat-oval (shallow plenum)
7.2Acoustic Liner
NOTEThe acoustic liner shall be UL 181 listed so that it will not delaminate and enter the airstream, and shall comply with ASTM C1071. (7.2.1)
7.2.2The liner shall be UL 181 listed and shall comply with ASTM C1071.
7.2.3The liner material shall achieve a flame-spread index not greater than 25 and a smoke-developed index not greater than 50 per ASTM E84, as required by NFPA 90A.
NOTEWhere the project is a healthcare, cleanroom, or food-service application, the liner shall be a double-wall perforated metal inner liner rather than exposed fibrous glass. (7.2.4)
7.2.5Healthcare and similar applications shall use a double-wall perforated-metal liner to prevent fiber shedding into the airstream.
7.3.1The occupied-space sound level shall be projected per ANSI/AHRI 885 from the AHRI 880 sound power data at design conditions, accounting for both the radiated and the discharge sound paths.
7.3.2The unit and liner selection shall meet the NC target scheduled for the zone.
NOTEThe controlling sound path — radiated through the casing or discharged through the outlet — shall be identified for each critical zone, and the liner thickness and density selected accordingly. (7.3.3)
NOTESkipping the AHRI 885 calculation and selecting liner by habit is the most common cause of post-occupancy noise complaints; run the calculation per zone before finalizing. (7.3.4)
Occupied-space NC targetselect
NC 20-30 (conference rooms)
NC 25-35 (open office)
NC 30-40 (corridors)
8Reheat Coils
8.1General
NOTEWhere the zone requires heating, the reheat coil type shall be selected from hydronic or electric based on the availability and cost-effectiveness of hot water distribution at the unit. (8.1.1)
NOTEInterior and perimeter zones with hot water available are most economically served by a one- or two-row hydronic coil; small isolated zones without practical hot water distribution are served by staged or SCR electric reheat. (8.1.2)
Reheat coil typeradio
○ None (cooling-only)
● Hydronic (hot water)
○ Electric (staged or SCR)
8.2Hydronic Reheat Coils
NOTEThe hydronic reheat coil entering water temperature scheduled for the unit shall match the hot water distribution system design temperature. (8.2.1)
NOTEA reheat coil selected for an entering water temperature that does not match the building hydronic system delivers inadequate capacity that cannot be corrected without replacing the coil; coordinate the temperature with the hydronic design before selection. (8.2.2)
8.2.3The coil shall be selected to deliver the scheduled heating capacity at the scheduled entering water temperature and flow rate.
8.2.4Coil tubes and fins shall be copper tubes with aluminum or copper fins, mechanically bonded.
8.2.5The coil waterside pressure drop shall not exceed the value scheduled for the unit.
8.2.6The reheat control valve shall be selected for the scheduled Cv and shall be rated for close-off against the system pump head.
8.2.7Hydronic supply, return, and balancing for the reheat coil are provided under Hydronic PipingHydronic PipingResolves to the current edition.sync/hydronic-piping and are not part of this standard.
Hydronic coil rowsradio
● 1 row (perimeter heating, typical)
○ 2 rows (higher capacity)
Entering water temperature (EWT)range
°F
120180
Leaving water temperature (LWT)range
°F
100130
Coil waterside pressure drop (maximum)range
ft H₂O
14
8.3Electric Reheat Coils
8.3.1Electric reheat coils shall comply with NFPA 70 (NEC) Article 424 for fixed electric space-heating equipment.
8.3.2An airflow-proving interlock shall prevent energizing the heating elements until proven airflow is established across the coil, per NEC Article 424.20.
NOTEOmitting the airflow-proving switch is both a code violation under NEC Article 424 and a fire risk, and is frequently missed when the electric heater is furnished as a field accessory. (8.3.3)
8.3.4The coil shall include integral over-temperature protection with automatic and manual reset thermal cutouts.
8.3.5The heating element sheath shall be of the material scheduled for the application.
8.3.6Branch-circuit conductors and overcurrent protection shall be sized per NEC Article 424 for the scheduled total kW.
Electric reheat total capacityrange
kW
0.510
Electric reheat controlradio
● 2 stages
○ 3 stages
○ SCR modulating
9Fan-Powered Terminal Units
9.1Fan-Powered Type Selection
NOTEThe fan-powered terminal unit type — series or parallel — shall be selected to match the zone application, not treated as interchangeable. (9.1.1)
NOTEA series unit runs its fan continuously and delivers a constant total airflow to the space regardless of primary airflow, which suits high-ceiling, high-air-change, or mixed-occupancy zones; a parallel unit runs its fan only on a call for heat and saves fan energy, which suits standard office perimeter zones. Selecting the wrong type for the application creates comfort complaints. (9.1.2)
Fan-powered configurationradio
○ Series (SFPTU, constant volume to space)
● Parallel (PFPTU, fan on heating only)
9.2Fan Motors
9.2.1Fan-powered VAV terminal units shall use electronically commutated motors (ECM); permanent split capacitor (PSC) motors shall not be used.
NOTEASHRAE 90.1 mandates ECM motors for fan-powered VAV units; a PSC unit specified in error will fail plan check or commissioning. (9.2.2)
9.2.3The fan motor power shall not exceed 0.5 W/CFM at design airflow, per ASHRAE 90.1 Section 6.5.3.1.1.
9.2.4The fan and motor shall comply with the applicable provisions of ANSI/NEMA MG 1.
9.2.5The fan airflow shall be set to deliver the scheduled total airflow and induction ratio for the unit.
Fan motor typeradio
● Electronically commutated (ECM) — required by 90.1
Fan motor power limitrange
W/CFM
0.30.5
NOTEWhere a fan-powered unit includes a cooling coil, a condensate drain pan shall be provided; the condensate drain piping is provided under Condensate Drainage PipingHVAC Condensate Drainage PipingResolves to the current edition.sync/condensate-drainage-piping. (9.2.6)
10Dual-Duct VAV Units
10.1Dual-Duct Mixing
10.1.1Dual-duct VAV units shall accept independent hot-deck and cold-deck primary air streams and blend them with separate pressure-independent damper control to maintain the zone setpoint.
10.1.2Each deck shall have its own averaging airflow sensor and damper actuator so that each inlet is independently metered and pressure-independent.
NOTEThe minimum setpoint strategy for a dual-duct unit shall account for the simultaneous hot-deck and cold-deck contributions to avoid excess reheat under ASHRAE 90.1. (10.1.3)
NOTEApplying a single-duct minimum-setpoint strategy to a dual-duct unit understates the combined airflow and produces simultaneous heating and cooling that violates the ASHRAE 90.1 reheat intent; set the deck minimums for the blended condition. (10.1.4)
11Controls and BACnet Integration
11.1DDC Controller
11.1.1Each VAV terminal unit shall be furnished with a DDC controller, either factory-integral or field-mounted as scheduled, capable of standalone occupied and unoccupied scheduling.
11.1.2The controller shall communicate on BACnet, either BACnet MS/TP or BACnet/IP as scheduled for the project network.
NOTEThe controller object list shall include, at minimum, analog outputs for damper position, analog inputs for airflow and room temperature, and binary points for occupancy and fan status. (11.1.3)
11.1.4The controller shall expose, at minimum, AO for damper position, AI for measured airflow and room temperature, and BI/BO for occupancy and fan status.
11.1.5The BACnet protocol version and device profile shall be confirmed with the BAS integrator before the controllers are ordered.
NOTEConfirming the BACnet profile with the integrator before ordering prevents costly firmware updates or gateway additions when an ATU controller profile does not match the BAS front-end. (11.1.6)
NOTEWhere a CO2 or occupancy sensor input is scheduled for demand-controlled ventilation, the controller shall accept and act on that input. (11.1.7)
DDC controller mountingradio
● Factory-integral
○ Field-mounted
BACnet communicationradio
● BACnet MS/TP
○ BACnet/IP
BACnet MS/TP baud rateselect
9600
19200
38400
76800
Demand-controlled ventilation inputradio
● None
○ CO2 sensor input
○ Occupancy sensor input
11.2Control Sequences
11.2.1The VAV terminal unit control sequence shall be based on ASHRAE Guideline 36-2021 unless the contract documents specify an alternative sequence.
NOTEASHRAE Guideline 36 is the industry-consensus best-practice sequence for VAV terminal units, covering zone setpoints, morning warm-up, demand-controlled ventilation, static pressure reset, and trim-and-respond logic; it is the preferred basis here even though it is a guideline rather than a mandatory code. (11.2.2)
11.2.3Each VAV terminal unit shall participate in the system static pressure reset, reporting its damper demand so the central fan static pressure can be trimmed and responded down to the lowest setpoint that satisfies all zones.
NOTEASHRAE 90.1-2022 Section 6.5.3.3 requires VAV systems with DDC controls to reset duct static pressure based on zone demand; the terminal unit must contribute its damper demand for that reset to function. (11.2.4)
Control sequence basisradio
● ASHRAE Guideline 36-2021 (preferred)
○ Manufacturer-standard sequence
Static pressure reset participationradio
● Trim-and-respond (damper demand reported)
○ Fixed duct static pressure (legacy)
12Testing
12.1Field Testing and Balancing
12.1.1Each VAV terminal unit shall be field-commissioned and air-balanced by the testing, adjusting, and balancing agency under Testing Adjusting And BalancingTesting, Adjusting, and Balancing for HVACResolves to the current edition.sync/testing-adjusting-and-balancing.
12.1.2The measured maximum and minimum primary airflow at each unit shall be within ±10% of the scheduled setpoints, or within ±5% for laboratory or critical applications.
12.1.3The airflow-proving interlock on electric reheat coils shall be functionally verified before the coil is energized.
12.1.4The control sequence and BACnet points shall be verified against the as-built point list during functional testing.
Field airflow commissioning toleranceradio
● ±10% of design setpoint (standard)
○ ±5% of design setpoint (labs / critical)
13Installation
13.1Mounting and Clearance
13.1.1VAV terminal units shall be installed level and supported independently of the connecting ductwork, with hangers sized for the unit operating weight.
13.1.2Adequate service clearance shall be provided for access to the damper actuator, reheat coil, controller, and fan, with a ceiling access panel where the unit is above a hard ceiling.
NOTELocating a unit in a tight plenum without access creates long-term maintenance problems and warranty claims; clearance and access shall be coordinated before installation. (13.1.3)
NOTEUnit locations shall be coordinated with the ceiling grid, light fixtures, sprinkler heads, and structure before installation. (13.1.4)
NOTEField relocation of units after installation generates coordination RFIs and potential duct rerouting; resolve conflicts during coordination, not in the field. (13.1.5)
13.2Connections
13.2.1The primary inlet shall be connected to the upstream duct with a straight run of the length recommended by the manufacturer to maintain airflow sensor accuracy.
13.2.2Outlet connections shall be made to the discharge collars or plenum as scheduled, single-outlet or multiple-outlet per the unit configuration.
13.2.3Electrical connections to electric reheat coils and fan motors shall be made per NEC and the manufacturer's wiring diagrams.
13.2.4Control and BACnet network wiring shall be installed under Building Automation SystemBuilding Automation SystemResolves to the current edition.sync/building-automation-system.
Outlet configurationradio
● Single-outlet
○ Multiple-outlet
○ Discharge plenum box
14Delivery, Storage, and Handling
14.1Protection
14.1.1Units shall be delivered in the manufacturer's packaging with inlet and outlet collars capped to keep the interior clean and dry.
14.1.2Units shall be stored indoors, protected from weather, dust, and construction debris until installation.
14.1.3Damaged casings, liners, coils, or controllers shall be repaired or replaced before installation; field-patched liner shall not be accepted.
15Warranty
15.1Warranty Coverage
15.1.1The manufacturer shall warrant each VAV terminal unit against defects in materials and workmanship for not less than the period scheduled below from the date of substantial completion.
15.1.2The warranty shall cover the casing, damper and actuator, airflow sensor, reheat coil, fan and ECM motor, and integral controller.
Warranty periodradio
● 1 year
○ 2 years
○ 5 years
16Spare Parts
16.1Recommended Spares
16.1.1The Contractor shall furnish the spare parts scheduled below to support the maintenance intervals of ANSI/ASHRAE/ACCA 180.
Spare damper actuator for each unit frame size on the project
Spare ECM motor for each fan-powered unit frame size
Spare DDC controller of each type furnished
Manufacturer's recommended consumables for the first year of operation