title: Vertical Transportation
…23 unchanged lines
## The elevator quantity, hoistway locations, rise, number and arrangement of stops, and the building dimensions of each hoistway, pit, and overhead shall be [[drawing: as indicated on the elevator plans, sections, and the elevator schedule]].
## The structural support for guide rails, machine beams, and hydraulic cylinder reactions shall be [[drawing: as indicated on the structural drawings]].
−## This work shall be coordinated with [[syncs/fire-alarm-systems]] for the smoke detector and heat detector initiating devices that command Phase I emergency recall and for any machine room or hoistway shunt trip.
−## This work shall be coordinated with [[syncs/emergency-and-standby-power]] for the standby power source, the automatic transfer of the elevators, and the sequenced recovery of cars on standby power.
−## This work shall be coordinated with [[syncs/conductors-and-cables]] for the feeders, branch circuits, and disconnecting means serving each elevator.
−## This work shall be coordinated with [[syncs/grounding-and-bonding]] for the equipment grounding and bonding of the controller, machine, rails, and car.
+## This work shall be coordinated with [[sync/fire-alarm-systems]] for the smoke detector and heat detector initiating devices that command Phase I emergency recall and for any machine room or hoistway shunt trip.
+## This work shall be coordinated with [[sync/emergency-and-standby-power]] for the standby power source, the automatic transfer of the elevators, and the sequenced recovery of cars on standby power.
+## This work shall be coordinated with [[sync/conductors-and-cables]] for the feeders, branch circuits, and disconnecting means serving each elevator.
+## This work shall be coordinated with [[sync/grounding-and-bonding]] for the equipment grounding and bonding of the controller, machine, rails, and car.
# Referenced Standards {toc}
…581 unchanged lines
### Phase I emergency recall operation complying with ASME A17.1 shall be provided on every elevator.
### Phase I recall shall be initiated automatically by the operation of a fire alarm initiating device installed at the designated level, the alternate level, each elevator lobby, the hoistway, and the machine room or machinery space.
−### The fire alarm initiating devices that command recall and any shunt trip shall be provided and interfaced under [[syncs/fire-alarm-systems]], and the recall and shutdown interface shall comply with NFPA 72.
+### The fire alarm initiating devices that command recall and any shunt trip shall be provided and interfaced under [[sync/fire-alarm-systems]], and the recall and shutdown interface shall comply with NFPA 72.
### A three-position (ON-OFF-BYPASS) Phase I key switch shall be provided at the designated level for each single elevator or group.
…34 unchanged lines
### Where the elevators are connected to a standby or emergency power source, the controller shall provide automatic emergency power operation complying with ASME A17.1.
### On transfer to standby power, the cars shall be returned to a landing in a controlled sequence, and the selected car or cars shall then resume operation as defined in the emergency power operation sequence.
−### The standby power source, the transfer scheme, and the number of cars to run on standby power shall be coordinated with [[syncs/emergency-and-standby-power]] in accordance with NFPA 110.
+### The standby power source, the transfer scheme, and the number of cars to run on standby power shall be coordinated with [[sync/emergency-and-standby-power]] in accordance with NFPA 110.
```datasheet
…101 unchanged lines
## Electrical and Interface Connections {toc}
−### Feeders, branch circuits, and the disconnecting means for each elevator shall be provided and connected in accordance with NFPA 70 Article 620 and [[syncs/conductors-and-cables]].
−### The controller, machine, rails, and car shall be grounded and bonded in accordance with [[syncs/grounding-and-bonding]] and NFPA 70.
−### The Phase I recall, shunt trip, and any sprinkler interface connections to the fire alarm system shall be made and verified with [[syncs/fire-alarm-systems]].
−### The standby power transfer and emergency power operation interface shall be made and verified with [[syncs/emergency-and-standby-power]].
+### Feeders, branch circuits, and the disconnecting means for each elevator shall be provided and connected in accordance with NFPA 70 Article 620 and [[sync/conductors-and-cables]].
+### The controller, machine, rails, and car shall be grounded and bonded in accordance with [[sync/grounding-and-bonding]] and NFPA 70.
+### The Phase I recall, shunt trip, and any sprinkler interface connections to the fire alarm system shall be made and verified with [[sync/fire-alarm-systems]].
+### The standby power transfer and emergency power operation interface shall be made and verified with [[sync/emergency-and-standby-power]].
## Protection During Construction {toc}
…94 unchanged lines
### A recommended spare-parts list with reorder information shall be included in the operation and maintenance manuals so the Owner can procure spares over the equipment's service life.