Total Building Commissioning
Cross-references re-pointed to the standard that now owns each subject, after neighboring standards were remade
Showing changes from Rev 2
to Rev 3
in Total Building Commissioning.
---
title: Total Building Commissioning
…14 unchanged lines
VFD parameter setup and drive startup (sync/hvac-variable-frequency-drives);
controls integration and sequence-of-operations development (sync/control-systems-integration);
− electrical acceptance testing such as relay coordination and hi-pot (sync/electrical-acceptance-testing);
+ electrical acceptance testing such as relay coordination and hi-pot ([[sync/electrical-acceptance-testing]]);
structured cabling certification (sync/structured-cabling); piping pressure and
hydrostatic tests (sync/hvac-piping-valves, sync/plumbing-piping-valves); seismic
…560 unchanged lines
## Defects identified during deferred, seasonal, or post-occupancy commissioning activities within the warranty period shall be corrected under the applicable system warranty at no additional cost to the Owner.