Construction Progress Documentation

Read revision 3

Revision 3 · Oct 17, 2026 +1 −1

P1 batch 4: hazardous-location installations, document confidentiality and AI use, generator paralleling switchgear, interrupter switchgear, medium-voltage drives and metal-enclosed bus now owned; bare-text mentions re-pointed to the new standards
Showing changes from Rev 2 to Rev 3 in Construction Progress Documentation.
---
title: Construction Progress Documentation
…558 unchanged lines
## The Contractor shall retain the complete set of progress documentation throughout the Work and deliver it to the Owner as part of the closeout package in accordance with [[sync/closeout-procedures]].
−## Ownership of and access rights to all progress documentation, including photographs, video, and construction-camera imagery, shall be settled in the Contract and shall not be left to resolution at project close. {note}
+## Ownership of and access rights to all progress documentation, including photographs, video, and construction-camera imagery, shall be settled in the Contract and shall not be left to resolution at project close; the confidentiality of that documentation and the consent to publish any of it are governed by [[sync/document-confidentiality-and-ai-use]]. {note}
## Disputes over who owns and may access the documentation, especially imagery from an Owner-hired or Contractor-hired construction camera, are entirely avoidable by stating ownership and access rights up front. Left unstated, they surface at exactly the moment the record is most needed. {note}