Electrical Power Monitoring and Metering
Remake batch 25 and its neighbor re-points, batch 24 where missing, and the adopted-electrical-code parameter: brought in line with the authoring repository
Showing changes from Rev 3
to Rev 4
in Electrical Power Monitoring and Metering.
---
title: Electrical Power Monitoring and Metering
…706 unchanged lines
## Voltage transformer primary fuses shall be installed and verified before the meter is energized.
−## Meter wiring shall be identified at each termination in accordance with [[sync/equipment-labeling]].
+## Meter wiring shall be identified at each termination in accordance with [[sync/electrical-identification]].
## Communication wiring shall be installed separately from power conductors to limit electrical noise on the data circuit.
…89 unchanged lines
default: 2
```