Facility Fuel-Oil Systems
P1 batch 3: knife gate valves, water storage tanks, water wells, cathodic protection and instrumentation cable now owned; bare-text mentions re-pointed to the new standards
Showing changes from Rev 5
to Rev 6
in Facility Fuel-Oil Systems.
---
title: Facility Fuel-Oil Systems
…734 unchanged lines
### Double-wall buried piping shall drain its interstice to a containment sump listed to UL 2447 at each tank, at each dispensing or transition point, and at each low point, with a leak sensor in each sump wired under this standard, and the interstice shall be continuous between sumps without a buried joint.
−### Buried steel piping shall be coated with a factory-applied coating holiday-tested before backfill, wrapped at every field joint, and cathodically protected under NACE SP0169 with a test station at grade, or shall be replaced by the nonmetallic piping the datasheet permits.
+### Buried steel piping shall be coated with a factory-applied coating holiday-tested before backfill, wrapped at every field joint, and cathodically protected under NACE SP0169 and [[sync/cathodic-protection]] with a test station at grade, or shall be replaced by the nonmetallic piping the datasheet permits.
### Buried piping shall be bedded on and surrounded by the material the piping manufacturer specifies and PEI RP100 describes, to the cover NFPA 30 requires, with a detectable warning tape above the pipe, and shall not pass under a building, a tank, or a foundation unless sleeved and accessible at each end.
…370 unchanged lines
## Spare parts shall match the installed parts in model and material, shall be delivered in the manufacturer's packaging with the part number marked on the outside, and shall be turned over against a written inventory signed by the Owner's representative.