Level Measurement
P1 batch 3: knife gate valves, water storage tanks, water wells, cathodic protection and instrumentation cable now owned; bare-text mentions re-pointed to the new standards
Showing changes from Rev 2
to Rev 3
in Level Measurement.
---
title: Level Measurement
…605 unchanged lines
### Conduit seals required by the area classification shall be installed within the code-required distance of the instrument and shall be poured before energization.
−### Signal wiring shall be installed in raceway per [[sync/raceways-and-conduit]], with conductors per [[sync/conductors-and-cables]], and instrument grounding and shield termination per [[sync/grounding-and-bonding]]; intrinsically safe wiring shall be segregated from non-IS wiring.
+### Signal wiring shall be installed in raceway per [[sync/raceways-and-conduit]], with cable and shield termination per [[sync/instrumentation-and-control-cable]], and instrument grounding per [[sync/grounding-and-bonding]]; intrinsically safe wiring shall be segregated from non-IS wiring.
### Power supplies and intrinsic-safety barriers shall be housed in panels per [[sync/industrial-control-panels]], and loops shall integrate to the control system per [[sync/control-systems-integration]].
…31 unchanged lines
default: [Spare process-connection gaskets/seals (per type)]
```