Membrane Roofing
Datasheet constraints: every range, checkbox and listbox field now states its direction
Showing changes from Rev 8
to Rev 9
in Membrane Roofing.
---
title: Membrane Roofing
…158 unchanged lines
- "Installer qualification evidence"
- "Proposed warranty forms and issuance conditions"
+constraint: all_of
```
…22 unchanged lines
- "Safety data sheets for adhesives, primers, cleaners, and coatings"
- "Sequence of work and nightly water cut-off method"
+constraint: all_of
```
…29 unchanged lines
- "Material certifications for membrane, insulation, and cover board"
- "Roof maintenance instructions for the Owner"
+constraint: all_of
```
…20 unchanged lines
- "Current membrane manufacturer authorization for the specified system"
- "Foreman experience meeting the minimum stated in this standard"
+constraint: all_of
```
…49 unchanged lines
- "Final inspection before warranty issuance"
- "Written report for each site visit"
+constraint: all_of
```
…50 unchanged lines
```datasheet
−label: Minimum Ambient and Substrate Installation Temperature
+label: Ambient and Substrate Installation Temperature
type: range
unit: °F
…2 unchanged lines
max: 60
step: 5
+constraint: min
```
…97 unchanged lines
step: 0.125
default: deferred
+constraint: exact
```
…34 unchanged lines
step: 1
default: deferred
+constraint: min
```
…8 unchanged lines
step: 1
default: deferred
+constraint: min
```
…8 unchanged lines
step: 1
default: deferred
+constraint: min
```
…150 unchanged lines
setpoints: [40, 45, 50, 60, 72, 80, 90]
default: deferred
+constraint: min
```
…35 unchanged lines
step: 1
default: deferred
+constraint: exact
```
…184 unchanged lines
- "Cellulosic fiberboard per ASTM C208"
- "Lightweight insulating concrete fill"
+constraint: any_of
```
…26 unchanged lines
step: 1
default: deferred
+constraint: min
```
…22 unchanged lines
step: 1
default: deferred
+constraint: min
```
…69 unchanged lines
setpoints: [0.25, 0.375, 0.5, 0.625, 0.75, 1]
default: deferred
+constraint: min
```
…194 unchanged lines
step: 1
default: deferred
+constraint: exact
```
…94 unchanged lines
step: 0.25
default: 1.5
+constraint: min
```
…9 unchanged lines
step: 0.25
default: 1
+constraint: min
```
…23 unchanged lines
step: 0.5
default: 3
+constraint: min
```
…17 unchanged lines
step: 0.5
default: 3
+constraint: min
```
…9 unchanged lines
step: 1
default: 6
+constraint: min
```
…15 unchanged lines
```datasheet
−label: Minimum Base Flashing Height Above Finished Roof Surface
+label: Base Flashing Height Above Finished Roof Surface
type: range
unit: in
…3 unchanged lines
step: 1
default: 8
+constraint: min
```
…66 unchanged lines
step: 2
default: 12
+constraint: max
```
…228 unchanged lines
default:
- "Documented visual inspection of all seams, flashings, and terminations"
+constraint: all_of
```
…9 unchanged lines
step: 1
default: 24
+constraint: min
```
…89 unchanged lines
step: 1
default: 2
+constraint: min
```
…34 unchanged lines
max: 35
setpoints: [5, 10, 12, 15, 20, 25, 30, 35]
+constraint: min
```
…8 unchanged lines
max: 150
setpoints: [0, 55, 72, 80, 90, 100, 120, 150]
+constraint: min
```
…14 unchanged lines
- "Membrane sheet and manufacturer-supplied seam materials"
- "Flashing and penetration accessories supplied by the membrane manufacturer"
+constraint: all_of
```
…37 unchanged lines
- "Insulation and cover board"
- "Prefabricated flashing accessories"
+constraint: all_of
```
…17 unchanged lines
### The Contractor shall conduct a turnover walk with the Owner's maintenance personnel covering roof access, the walkway route, the drainage points, and the locations identified in the maintenance instructions.