Panelboards
Remake batch 26: rewritten from scratch under the authoring cheatsheet with datasheet constraints; neighbors re-pointed to the new scope boundaries; the electrical code is now the adopted-electrical-code project fact
Showing changes from Rev 6
to Rev 7
in Panelboards.
---
title: Panelboards
…22 unchanged lines
- the raceways entering the cabinet, under [[sync/raceways-and-conduit]]
- the grounding electrode system, the equipment grounding conductors, and the bonding of a separately derived system, under [[sync/grounding-and-bonding]]
−- the service point, the service conductors, and the utility metering, under [[sync/electrical-service-entrance]]
+- the service point and the utility metering, under [[sync/electrical-service-entrance]], and the service conductors, under [[sync/distribution-feeder-cables]]
- the surge protective device as a product, its ratings, its protection modes, and its lead length, under [[sync/surge-protective-devices]]
- the meters, their accuracy class, their current transformers, and the monitoring system they report to, under [[sync/electrical-power-monitoring]]
…1189 unchanged lines
## Spare devices shall be stored in a labeled container in the electrical room, and shall not be stored inside an operating panelboard.