Pavement Markings and Site Signage

Read revision 4

Revision 4 · Sep 16, 2026 +2 −1

Content update
Showing changes from Rev 3 to Rev 4 in Pavement Markings and Site Signage.
---
title: Pavement Markings and Site Signage
…74 unchanged lines
- "Stall, arrow, stop-bar, crosswalk, and legend layout with accessible count"
- "Fire-lane marking and signage layout (fire marshal coordinated)"
−default: "Sign schedule (MUTCD designation, size, sheeting type, quantity)"
+default:
+ - "Sign schedule (MUTCD designation, size, sheeting type, quantity)"
```
…634 unchanged lines
## Normal wear from traffic and routine renewal of paint markings at the end of their service life are Owner maintenance obligations and are not warranty items.
## The warranty does not relieve the Contractor of responsibility for an accessibility or fire-code non-conformance, which shall be corrected regardless of when it is discovered.

View current revision