Quality Requirements

Read revision 3

Revision 3 · Oct 8, 2026 +1 −1

Cross-references re-pointed to the standard that now owns each subject, after neighboring standards were remade
Showing changes from Rev 2 to Rev 3 in Quality Requirements.
---
title: Quality Requirements
…2 unchanged lines
description: >
When to use: project-wide administrative framework for quality assurance and quality control on commercial and institutional new construction, renovation, and addition work — qualification and engagement of independent testing and inspection agencies, pre-construction and in-progress and post-installation testing, field mockups, incorporation of reference standards into contract requirements, quality-related pre-installation meetings, and the chain of responsibility for scheduling, cost, reporting, and corrective action.
− Not intended for: IBC Chapter 17 / ASCE 7 special inspections and the Statement of Special Inspections (use sync/special-inspections-and-testing); electrical acceptance testing of switchgear, cables, relays, and transformers (sync/electrical-acceptance-testing); functional performance verification of MEP systems (sync/commissioning); the submittal and shop-drawing approval workflow (sync/submittal-and-quality-procedures); closeout documentation, T&B reports, and turnover packages (sync/closeout-procedures); O&M data binders (sync/operation-and-maintenance-data); temporary field facilities (sync/temporary-facilities-and-controls); and warranty and bond administration after substantial completion (sync/warranties-and-bonds).
+ Not intended for: IBC Chapter 17 / ASCE 7 special inspections and the Statement of Special Inspections (use sync/special-inspections-and-testing); electrical acceptance testing of switchgear, cables, relays, and transformers ([[sync/electrical-acceptance-testing]]); functional performance verification of MEP systems (sync/commissioning); the submittal and shop-drawing approval workflow (sync/submittal-and-quality-procedures); closeout documentation, T&B reports, and turnover packages (sync/closeout-procedures); O&M data binders (sync/operation-and-maintenance-data); temporary field facilities (sync/temporary-facilities-and-controls); and warranty and bond administration after substantial completion (sync/warranties-and-bonds).
---
…620 unchanged lines
## Where a material is subject to both a special inspection and a general test under this Section, the Contractor shall coordinate the two so that each is performed once and reported to its required recipient.