title: Site Retaining Walls
…217 unchanged lines
- "Adjacent building foundation within the zone of influence"
- "Construction equipment / stockpile surcharge (temporary)"
−default: "None — level, unloaded backfill"
+default:
+ - "None — level, unloaded backfill"
```
…600 unchanged lines
## Where directed by the geotechnical engineer, survey monuments shall be installed on the wall and read at specified intervals to provide objective data on wall movement during the warranty period.