Telecommunications Bonding and Grounding
Remake batch 26: rewritten from scratch under the authoring cheatsheet with datasheet constraints; neighbors re-pointed to the new scope boundaries; the electrical code is now the adopted-electrical-code project fact
Showing changes from Rev 7
to Rev 8
in Telecommunications Bonding and Grounding.
---
title: Telecommunications Bonding and Grounding
…23 unchanged lines
## Coordination with [[sync/grounding-and-bonding]] is required at the point of connection to the building grounding electrode system.
−## Coordination with [[sync/raceways-and-conduit]] is required for telecommunications pathways and the bonding of metallic raceways used as telecommunications pathways.
+## Coordination with [[sync/telecommunications-rooms-and-pathways]] and [[sync/raceways-and-conduit]] is required for telecommunications pathways and the bonding of metallic raceways used as telecommunications pathways.
## Coordination with [[sync/conductors-and-cables]] is required for the supply branch circuits serving telecommunications equipment.
…970 unchanged lines
## Where the achieved SBB-to-PBB resistance is marginal relative to the acceptance criterion, the Engineer may require re-testing during the warranty period to confirm that the bonding network's integrity has not degraded.