Video Surveillance Systems
Cross-references re-pointed to the standard that now owns each subject, after neighboring standards were remade
Showing changes from Rev 2
to Rev 3
in Video Surveillance Systems.
---
title: Video Surveillance Systems
…32 unchanged lines
## Acceptance and performance testing of the installed VSS shall be performed in accordance with the project's electrical acceptance program.
−### Field acceptance, continuity-of-recording verification, and network commissioning shall follow [[sync/electrical-acceptance-testing]] where a project-wide acceptance program is specified. {note}
+### Field acceptance, continuity-of-recording verification, and network commissioning are part of the work of this standard; power-equipment acceptance testing does not cover cameras or recorders. {note}
# Referenced Standards {toc}
…656 unchanged lines
default: 1
```