Conductors and Cables
Revision 3
· SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official
· Jun 8, 2026
+0
−0
Tag-only update
Tag changes
+AC Power+Acceptance Testing+Copper Cabling+Electrical+Low Voltage+NEC+Power Distribution
---
title: Conductors and Cables
…977 unchanged lines
## Where insulation resistance test results during the warranty period reveal degradation from values recorded at acceptance, the Contractor shall investigate and shall demonstrate that the degradation is attributable to building conditions (moisture infiltration, chemical attack, elevated temperature) rather than workmanship defects before declining responsibility.
View current revision