## Periodic inspection of the energy control procedure shall be performed at least annually.
−## OSHA 1910.147(c)(6) requires the employer to inspect each energy control procedure at least annually to verify that workers are following it and that the procedure remains adequate. The inspection is documented and identifies the procedure, the workers included, and the inspector. On long-duration construction this falls within the project; the program must schedule it rather than assume the facility's annual cycle covers project-specific procedures. {note}
−
```datasheet
label: LOTO Periodic Inspection Interval
…6 unchanged lines
```
+## OSHA 1910.147(c)(6) requires the employer to inspect each energy control procedure at least annually to verify that workers are following it and that the procedure remains adequate. The inspection is documented and identifies the procedure, the workers included, and the inspector. On long-duration construction this falls within the project; the program must schedule it rather than assume the facility's annual cycle covers project-specific procedures. {note}
+
# Personal Protective Equipment {toc}
…125 unchanged lines
## Spare arc flash labels and label stock shall be retained so that labels damaged or made illegible in service can be replaced without delaying work.