Exterior Insulation and Finish Systems (EIFS)

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +3 −3

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Exterior Insulation and Finish Systems (EIFS).
Tag changes −Above Grade−Cladding−IBC−Insulation−Multi-Family Residential
---
title: Exterior Insulation and Finish Systems (EIFS)
539 unchanged lines
label: Finish Texture
type: select
+drawing_ref: "finish schedule"
options:
- "Fine / sand texture"
- "Medium aggregate texture"
- "Coarse aggregate texture"
- "Troweled / smooth texture"
- "Per finish schedule on drawings"
default: "Medium aggregate texture"
```
2 unchanged lines
label: Finish Color
type: text
drawing_ref: true
default: "Per Engineer of Record — see finish schedule on drawings"
+drawing_ref: "finish schedule"
+default: deferred
```
262 unchanged lines
## The Contractor shall deliver to the Owner, where required by the contract documents, attic stock of finish material in each specified color and texture in sealed factory containers, so that future damage can be repaired with matching material.
## The batch numbers of the installed finish shall be recorded and provided so future material can be matched as closely as possible.

View current revision