process or comfort cooling where humidification is incidental, residential
furnace-mount bypass humidifiers, or the air-handling units themselves
− (see [[syncs/air-handling-units]] and [[syncs/dedicated-outdoor-air-systems]]).
+ (see [[sync/air-handling-units]] and [[sync/dedicated-outdoor-air-systems]]).
---
…14 unchanged lines
### Selection of humidifier technology shall match the project's facility type, infection-control requirements, available utilities, and water quality.
−### Coordination of the supply water source and treatment shall be governed by [[syncs/hvac-water-treatment]] where treated water is required.
+### Coordination of the supply water source and treatment shall be governed by [[sync/hvac-water-treatment]] where treated water is required.
−### Dispersion-assembly thermal insulation, where the assembly is mounted in or adjacent to an air handler, shall conform to [[syncs/mechanical-insulation]].
+### Dispersion-assembly thermal insulation, where the assembly is mounted in or adjacent to an air handler, shall conform to [[sync/mechanical-insulation]].
−### Control integration with the facility management system shall conform to [[syncs/building-automation-system]].
+### Control integration with the facility management system shall conform to [[sync/building-automation-system]].
# Referenced Standards {toc}
…383 unchanged lines
### Where reverse-osmosis or deionized water is required, its production and distribution shall be coordinated with the Plumbing Engineer.
−### Treated-water chemistry, where treatment is provided, shall conform to [[syncs/hvac-water-treatment]].
+### Treated-water chemistry, where treatment is provided, shall conform to [[sync/hvac-water-treatment]].
### The supply-water connection shall include a shutoff valve, strainer, and any fill valve or float assembly required by the manufacturer.
…38 unchanged lines
### The location of the dispersion assembly within the air handler or duct shall be coordinated with the air-handler manufacturer and shown on the drawings. [[drawing: dispersion assembly location]]
−### Where the dispersion assembly is factory-mounted in an air handler, its location and clearances shall be coordinated under [[syncs/air-handling-units]].
+### Where the dispersion assembly is factory-mounted in an air handler, its location and clearances shall be coordinated under [[sync/air-handling-units]].
# Controls and Safeties {toc}
…67 unchanged lines
### Low-water, cylinder end-of-life, and drain-fault conditions shall each be reported as discrete alarms to the facility management system.
−### Control-network integration shall conform to [[syncs/building-automation-system]].
+### Control-network integration shall conform to [[sync/building-automation-system]].
# Drain, Blowdown, and Condensate {toc}
…131 unchanged lines
```
−### Dispersion-assembly and connecting-pipe insulation shall be installed in accordance with [[syncs/mechanical-insulation]].
+### Dispersion-assembly and connecting-pipe insulation shall be installed in accordance with [[sync/mechanical-insulation]].
# Delivery, Storage, and Handling {toc}
…56 unchanged lines
### The replacement-part service schedule shall state the expected service interval for each consumable based on the design water quality.