Hydronic Piping

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 8, 2026 +0 −0

Tag-only update
Showing changes from Rev 3 to Rev 4 in Hydronic Piping.
Tag changes +HVAC+Hot Water+Hydronics+Insulation+Piping
---
title: Hydronic Piping
1589 unchanged lines
### Every CHW fitting, flange, and valve shall be insulated with fitting covers or mitered sections sealed with manufacturer's vapor-retarder adhesive before final inspection, because chilled water insulation vapor retarder breaches at supports, valve bodies, and fitting insulation seams cause condensation drips on ceilings and floors.

View current revision