---
title: Metal Wall Panels
…815 unchanged lines
## The Contractor shall deliver to the Owner, where required by the contract documents, attic stock of panels, closures, and trim in the specified finishes and colors so that future damaged panels can be replaced with matching material, since a custom finish color may be unavailable or may not match a later production run.
## Touch-up finish in each specified color shall be provided in sealed factory containers.