Metal Wall Panels

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +1 −1

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Metal Wall Panels.
Tag changes −Above Grade−Architectural−Cladding−Fire Protection−IBC−Multi-Family Residential−Steel
---
title: Metal Wall Panels
563 unchanged lines
type: text
drawing_ref: true
default: "Per Engineer of Record — see finish schedule on drawings"
+default: deferred
```
247 unchanged lines
## The Contractor shall deliver to the Owner, where required by the contract documents, attic stock of panels, closures, and trim in the specified finishes and colors so that future damaged panels can be replaced with matching material, since a custom finish color may be unavailable or may not match a later production run.
## Touch-up finish in each specified color shall be provided in sealed factory containers.

View current revision