Storm Drainage

Revision 3 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 8, 2026 +0 −0

Tag-only update
Showing changes from Rev 2 to Rev 3 in Storm Drainage.
Tag changes +Civil+Earthwork+Excavation+Site Utilities+Storm Drainage+Stormwater Management
---
title: Storm Drainage
1143 unchanged lines
## Pipe installed at incorrect slope, structures with leaking joints concealed by exterior backfill, castings under-rated for the load class of the location, or pipe materials substituted from the specified standard remain the Contractor's responsibility as latent defects whenever discovered. {note}