Architectural Precast Concrete
Datasheet constraints: every range, checkbox and listbox field now states its direction
Showing changes from Rev 3
to Rev 4
in Architectural Precast Concrete.
---
title: Architectural Precast Concrete
…135 unchanged lines
- "Finish samples and range samples"
- "Product data for reinforcement, hardware, insulation, pads, grout, facings, and sealer"
+constraint: all_of
```
…34 unchanged lines
- "Producer's quality control program"
- "Handling, shipping, and storage plan"
+constraint: all_of
```
…28 unchanged lines
- "Special inspection reports"
- "Warranties"
+constraint: all_of
```
…87 unchanged lines
setpoints: [10, 20, 30, 50]
default: 20
+constraint: exact
```
…122 unchanged lines
step: 1
default: derived
+constraint: min
```
…53 unchanged lines
```datasheet
−label: Maximum Water-Cementitious Materials Ratio, Face Mix
+label: Water-Cementitious Materials Ratio, Face Mix
type: range
unit: w/cm
…4 unchanged lines
step: 0.01
default: derived
+constraint: max
```
…13 unchanged lines
setpoints: [4000, 5000, 6000, 7000, 8000]
default: 5000
+constraint: min
```
…9 unchanged lines
setpoints: [4000, 5000, 6000, 7000, 8000]
default: 5000
+constraint: min
```
…183 unchanged lines
setpoints: [0.375, 0.5, 0.625, 0.75, 1, 1.25, 1.5]
default: 0.75
+constraint: exact
```
…133 unchanged lines
setpoints: [1, 2, 3, 5]
default: 1
+constraint: min
```
…19 unchanged lines
default:
- "Patching materials for each face mix, with the batch proportions"
+constraint: all_of
```
## A repair made years after acceptance can match the face only if it is made from the same cement, sand, and pigment the face was cast from, and those materials are gone from the plant within a season. The patching stock, with the batch record from the closeout submittals, is what makes a future repair possible. {note}