1 Scope

NOTE This standard governs two things. First, the service conductors complete, because no other standard carries them: the conductor or cable that runs from the service point to the service disconnecting means, its material, its size, the temperature basis it is sized on, the splices and terminations made on its line side, and the tests that release it for connection. Second, the rules that apply to a feeder because it is a feeder: how it is sized to the load it carries, how it is protected, how a parallel set is arranged, how its neutral is sized, how much voltage it is allowed to lose, where it is tapped, and what is measured on it after energization. (1.1)
NOTE The conductor as a product is specified once, under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables. That standard carries the material selection for feeders and branch circuits, the insulation types, the stranding, the color coding, the ampacity correction and adjustment factors, the connector and splice hardware, the pulling limits, and the insulation resistance test of building wire. This standard is a layer over it: a feeder is built of the conductor product selected there and applied as this standard requires, and nothing in that standard is restated here. The service conductors are the exception, because Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables excludes them, so their product, sizing, terminations, and tests are carried here in full. (1.2)
NOTE Service conductors run from the service point to the service disconnecting means and have no overcurrent protection on the premises side; the serving utility's protection is the only thing that clears a fault on them. Feeders run from the service equipment, a separately derived system, or another feeder's overcurrent device to the final branch circuit overcurrent device, and each is protected at its supply end. The difference in protection is why the service conductors are sized and routed under rules of their own and why the feeder rules of this standard rest on the overcurrent device at the feeder's source. (1.3)
NOTE The following are governed elsewhere and are outside this standard: (1.4)
  • the conductor and cable product for feeders and branch circuits, including the feeder conductor material selection, the insulation type, the stranding, the color coding, the ampacity correction and adjustment factors, the connector and splice hardware, the aluminum termination practice, the pulling limits, and the insulation resistance test of building wire, under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables
  • branch circuits of every kind, under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables
  • the service arrangement, the utility coordination, the drop and the lateral, which party furnishes the lateral, the metering, the disconnecting means, the wiring method of the service, and the NFPA 70 Article 230 routing rules for the run, including its length inside the building, its seals, its protection from physical damage, and its clearances, under Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance
  • cable rated above 1000 V, under Medium Voltage CablesMedium-Voltage CablesResolves to the current adopted revision.sync/medium-voltage-cables
  • busway used as a service or as a feeder, whose bars are the conductors, under BuswayBuswayResolves to the current adopted revision.sync/busway
  • the raceway as a product, its supports, its fill, and its burial cover, under Raceways And ConduitRaceways and ConduitResolves to the current adopted revision.sync/raceways-and-conduit; the concrete-encased duct bank, under Underground DuctbankUnderground Electrical Duct BanksResolves to the current adopted revision.sync/underground-ductbank; and the manholes and handholes along it, under Utility Manholes And HandholesUtility Manholes and HandholesResolves to the current adopted revision.sync/utility-manholes-and-handholes
  • the grounding electrode conductor, the main bonding jumper, the supply-side bonding jumper, and the equipment grounding conductor of every feeder, including its size and its treatment in a parallel set, under Grounding And BondingGrounding and Bonding for Electrical SystemsResolves to the current adopted revision.sync/grounding-and-bonding
  • the lugs and terminals that the service equipment, the switchboard, the switchgear, and the panelboard furnish, under Low Voltage SwitchboardsLow Voltage SwitchboardsResolves to the current adopted revision.sync/low-voltage-switchboards, Low Voltage SwitchgearLow Voltage SwitchgearResolves to the current adopted revision.sync/low-voltage-switchgear, and PanelboardsPanelboardsResolves to the current adopted revision.sync/panelboards
  • the testing organization, its technicians, its instruments, its safety practice, and the compiled test report, under Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing
  • the available fault current, the withstand of the conductors under it, and the settings of the feeder overcurrent devices, under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study and Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study
  • the crane and hoist runway, its runway conductors, and everything load side of the runway disconnecting means, under Overhead Material HandlingOverhead Cranes and HoistsResolves to the current adopted revision.sync/overhead-material-handling
  • the telecommunications entrance facility and the pathways inside it, under Telecommunications Rooms And PathwaysTelecommunications Rooms and PathwaysResolves to the current adopted revision.sync/telecommunications-rooms-and-pathways
  • the label stock, lettering, and attachment of field markings, under Electrical IdentificationWiring System IdentificationResolves to the current adopted revision.sync/electrical-identification
1.5 The installation shall comply with Adopted Electrical CodeAdopted Electrical CodeParameterEach project supplies its own value.adopted-electrical-code and with the amendments of the Authority Having Jurisdiction, and shall be made available for the inspections that authority requires.
1.6 The service conductors and the feeders within this standard shall be as indicated on the one-line diagram.
1.7 Where a value stated on the one-line diagram or the feeder schedule for a particular service or feeder differs from the datasheet selection under this standard, the one-line diagram or the feeder schedule shall govern for that service or feeder.

2 Referenced Standards

2.1 Materials and installation shall comply with the latest adopted edition of each of the following unless a specific edition is cited.
2.2 Where the contract documents, the serving utility's requirements, the Authority Having Jurisdiction, or two referenced standards impose conflicting requirements, the more stringent requirement shall govern unless the Engineer of Record directs otherwise in writing.
Standard Title
NFPA 70 National Electrical Code (Articles 110, 215, 220, 225, 230, 240, 250, 300, 310, and 610)
NFPA 70E Standard for Electrical Safety in the Workplace
UL 44 Thermoset-Insulated Wires and Cables
UL 83 Thermoplastic-Insulated Wires and Cables
UL 854 Service-Entrance Cables
UL 1569 Metal-Clad Cables
UL 486A-486B Wire Connectors
UL 486C Splicing Wire Connectors
UL 486D Sealed Wire Connector Systems
ASTM B3 Standard Specification for Soft or Annealed Copper Wire
ASTM B8 Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM B496 Standard Specification for Compact Round Concentric-Lay-Stranded Copper Conductors
ASTM B800 Standard Specification for 8000 Series Aluminum Alloy Wire for Electrical Purposes, Annealed and Intermediate Tempers
ASTM B801 Standard Specification for Concentric-Lay-Stranded Conductors of 8000 Series Aluminum Alloy for Subsequent Covering or Insulation
ANSI/NEMA WC 70 / ICEA S-95-658 Non-Shielded Power Cables Rated 2000 Volts or Less for the Distribution of Electrical Energy
ANSI/NETA ATS Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
IEEE 141 Recommended Practice for Electric Power Distribution for Industrial Plants (Red Book)
IEEE 241 Recommended Practice for Electric Power Systems in Commercial Buildings (Gray Book)

3 Submittals

3.1 Action Submittals

3.1.1 The Contractor shall submit the following for review before any service conductor is ordered and before any parallel set, tap, or transformer secondary conductor is installed:
  • product data for each service conductor or cable type, identifying the listing, the conductor material and alloy, the insulation type and temperature rating, the voltage rating, and the applicable UL and ASTM standards
  • the service conductor sizing calculation, giving the calculated load under NFPA 70 Article 220, the continuous portion, the termination temperature column used, the ambient and adjustment corrections applied, and the resulting size and number of sets
  • the parallel set installation plan for each service and feeder run in parallel, showing the number of raceways, the conductors in each, the route of each raceway, and the planned length of each conductor
  • a schedule of every feeder tap and transformer secondary conductor, giving the tap rule applied, the conductor size, the length, the enclosure it runs in, and the overcurrent device that terminates it
  • product data for each line-side splice and tap connector, identifying the listing and the marking for use on the line side of service equipment
Action Submittalscheckbox
☑ Service conductor product data
☑ Service conductor sizing calculation
☑ Parallel set installation plan
☑ Feeder tap and transformer secondary conductor schedule
☑ Line-side splice and tap connector product data
3.1.2 No service conductor shall be ordered, and no parallel set shall be pulled, until the action submittal covering it has been reviewed and returned.
NOTE The product data and the voltage drop calculations for the feeder conductors as a product are submitted under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables and are not repeated here. (3.1.3)

3.2 Closeout Submittals

3.2.1 The Contractor shall submit the following before the service is presented to the utility for connection and before the feeders are accepted:
  • the acceptance test report for the service conductors, giving the test voltage, the duration, each measured value, the acceptance criterion applied, and the tester's determination
  • the measured length of each conductor of every parallel set, recorded by set and by raceway
  • the parallel set current balance record and the feeder neutral current record, where those tests are selected, giving the load condition and each measured value
  • the as-installed record of every service conductor, parallel set, tap, and transformer secondary conductor whose size, count, route, or connector differs from the reviewed submittal
Closeout Submittalscheckbox
☑ Service conductor acceptance test report
☑ Parallel set conductor length record
☑ Current balance and neutral current records
☑ As-installed service and feeder conductor record

4 Quality Assurance

4.1 Installer Qualifications

4.1.1 Service conductors and feeders shall be installed by an electrical contractor licensed in the jurisdiction of the project, and the terminations and splices on the line side of the service equipment shall be made by electricians trained by the connector manufacturer or by the Contractor's own program in the connectors used.
4.1.2 Where the parties disagree whether an electrician's training covers the connector used, the Engineer of Record shall make the initial determination.

4.2 Listing and Marking

4.2.1 Every service conductor and cable shall be listed and labeled by a Nationally Recognized Testing Laboratory under UL 44, UL 83, UL 854, or UL 1569 for its type, and shall carry the surface marking that standard requires.
4.2.2 Every connector used on the line side of the service equipment shall be listed under UL 486A-486B, UL 486C, or UL 486D for the conductor material and size range, and shall be marked as suitable for use on the line side of service equipment.
NOTE A connector on the line side of the service equipment sits where no premises overcurrent device protects it; the line-side marking means the connector has been tested to carry and withstand fault current with only the utility's protection ahead of it. (4.2.3)

4.3 Substitutions

4.3.1 A change of service conductor material, type, size, or number of sets from the reviewed submittal shall be made only with the written approval of the Engineer of Record, and shall be accompanied by a revised sizing calculation and, where the material changes, by confirmation that every termination on the run is listed for the new material.

5 Environmental and Service Conditions

5.1 Ambient Temperature Basis

5.1.1 Service conductors shall be sized with the ambient temperature correction and the conductor count adjustment that Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables applies to feeders, taken at the hottest location along the run.
5.1.2 Service conductors in a raceway exposed to direct sunlight outdoors shall be corrected for Site Ambient Temperature MaximumSite Ambient Temperature MaximumParameterEach project supplies its own value.site-ambient-temperature-maximum, with the rooftop temperature adder of NFPA 70 310.15(B)(2) added where the raceway is on or above a roof within the distance that section states.
NOTE A service raceway on a sunlit wall or a roof runs well above the 30 °C basis of the ampacity table for much of the day, and the service conductors in it carry the whole load of the building; a service sized at the table ampacity without the correction is the service that runs hot in the first summer. (5.1.3)

5.2 Underground and Wet Locations

5.2.1 Service conductors and feeders in an underground raceway, a direct-buried cable, or a raceway in a wet location shall be of a type listed for wet locations, and a cable direct-buried shall be of a type listed for direct burial.
5.2.2 Where a service or a feeder runs in a concrete-encased duct bank with other loaded circuits, its ampacity shall be established for the duct bank configuration and the soil thermal resistivity in accordance with NFPA 70 310.15 and Informative Annex B, rather than taken from NFPA 70 Table 310.16 alone.
NOTE An underground raceway is a wet location over the life of the installation because groundwater enters through the joints, and a duct bank with several loaded circuits heats the earth around it so that no circuit in it runs at the free-raceway ampacity; the duct bank itself is built under Underground DuctbankUnderground Electrical Duct BanksResolves to the current adopted revision.sync/underground-ductbank, and the ampacity of the conductors inside it is a consequence of how many circuits it carries. (5.2.3)

6 Service Conductors

6.1 Service Conductor Type

6.1.1 The service conductor or cable type shall be as indicated in the datasheet.
Service Conductor Typeselect
Type THHN/THWN-2 single conductors
Type XHHW-2 single conductors
Type RHW-2 single conductors
Type USE-2 single conductors
Type SE cable, Type SEU or SER
Type USE cable assembly, direct buried
Type MC cable listed for service-entrance use
NOTE THHN/THWN-2 is the thermoplastic building wire most raceway services are pulled with, at the smallest diameter and the lowest cost; XHHW-2 is a thermoset insulation that does not soften under sustained heat and absorbs less moisture, which suits a service raceway that runs hot or wet and a large aluminum service where thermal margin at the lugs matters, at a slightly larger diameter; RHW-2 is a thermoset type with a separate jacket that serves the same locations where the Owner's standard calls for it; USE-2 is the wet-location and direct-burial type that carries an underground service from the utility's terminals and is also listed for the raceway run inside; Type SE cable is the cable assembly of most dwelling and small commercial services and costs least where the serving utility and the Authority Having Jurisdiction accept it; a direct-buried Type USE cable assembly removes the raceway and cannot be replaced without re-excavation; Type MC cable listed for service-entrance use serves an indoor run between a transformer vault and the service equipment where a raceway cannot be routed. The wiring method of the service, raceway, cable, or busway, is selected under Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance, and where that selection is busway the bars of the busway are the service conductors, under BuswayBuswayResolves to the current adopted revision.sync/busway, and the conductor selections of this article do not apply. (6.1.2)
6.1.3 Service conductors shall be rated not less than 600 V.
6.1.4 The service conductor type shall be listed for every location the run passes through, including the underground portion, the portion exposed to the weather, and the portion inside the building.

6.2 Service Conductor Material

6.2.1 The service conductor material shall be as indicated in the datasheet.
Service Conductor Materialradio
● Copper
○ Aluminum
○ Copper-clad aluminum
NOTE Copper carries more current per unit of cross-section, terminates on every listed lug without a compound, and is less subject to creep at the terminal, at the highest material cost; aluminum weighs about half as much and costs a fraction of copper for the same ampacity at the sizes a service uses, and it is what most utilities run on their own side of the service point, at the cost of a larger conductor and raceway, lugs listed for aluminum, and the oxide-inhibiting practice at every termination; copper-clad aluminum weighs and costs near aluminum and is terminated as aluminum, and serves where the Owner wants a copper surface at the strand without the weight of copper. A service point at the utility's aluminum lugs takes any of the three. (6.2.2)
6.2.3 Copper service conductors shall be soft-drawn or annealed copper conforming to ASTM B3 for solid wire or ASTM B8 for concentric-lay stranding, or ASTM B496 for compact stranding.
6.2.4 Aluminum and copper-clad aluminum service conductors shall be of AA-8000 series aluminum alloy conforming to ASTM B800 and ASTM B801, in accordance with NFPA 70 310.3(B).
NOTE Aluminum 1350 conductor remains in use on the utility's side of the service point and in utility-furnished lateral conductors, and NFPA 70 310.3(B) does not accept it for conductors the Contractor furnishes, because its creep and its thermal expansion loosen a bolted terminal over the years in a way the 8000 series alloy was developed to resist. (6.2.5)
6.2.6 Where aluminum or copper-clad aluminum service conductors are selected, every lug, connector, and terminal on the run shall be listed and marked for aluminum, and the terminations shall be prepared and made as the Aluminum Terminations article of Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables requires.
6.2.7 Service conductors 8 AWG and larger shall be stranded.

6.3 Service Conductor Sizing

6.3.1 Each set of service conductors shall have an ampacity, after the correction and adjustment factors of NFPA 70 310.15, not less than the noncontinuous load plus 125 % of the continuous load calculated under NFPA 70 Article 220, in accordance with NFPA 70 230.42(A).
6.3.2 Where the service overcurrent device and the assembly it is installed in are listed for operation at 100 % of their rating, the service conductors may be sized at 100 % of the continuous load plus the noncontinuous load, as NFPA 70 230.42(A) Exception No. 1 permits.
6.3.3 The ampacity of the service conductors shall be not less than the rating of the service disconnecting means, in accordance with NFPA 70 230.42(B), except that where the conductor ampacity does not correspond to a standard overcurrent device rating, the next higher standard rating may protect them where that rating does not exceed 800 A, as NFPA 70 230.90(A) Exception No. 2 permits.
6.3.4 Where grouped service disconnects are furnished, the service conductors shall have an ampacity not less than the calculated load of the whole service, and the sum of the ratings of the grouped disconnects may exceed the ampacity of the service conductors only as NFPA 70 230.90(A) Exception No. 3 permits.
6.3.5 The size, the number of conductors per phase, and the number of sets of the service conductors shall be as indicated on the one-line diagram.
6.3.6 The grounded service conductor shall be sized for the maximum unbalanced load under NFPA 70 220.61, and shall be not smaller than NFPA 70 250.24(C) and Table 250.102(C)(1) require for the largest ungrounded service conductor or for the equivalent area of a parallel set.
6.3.7 Where the service conductors are installed in parallel in more than one raceway, the grounded service conductor shall be run in each raceway, sized under NFPA 70 250.24(C)(2) on the ungrounded conductors in that raceway and not smaller than 1/0 AWG.
NOTE The grounded service conductor carries the unbalanced load in service and the whole fault current when a service conductor faults to the enclosure, and the second duty is why NFPA 70 sizes it from the ungrounded conductors as well as from the load; the grounding electrode conductor and the main bonding jumper it lands beside are sized under Grounding And BondingGrounding and Bonding for Electrical SystemsResolves to the current adopted revision.sync/grounding-and-bonding. (6.3.8)

6.4 Service Conductor Termination Temperature

6.4.1 Service conductors shall be sized from the ampacity column of NFPA 70 Table 310.16 corresponding to the termination temperature rating indicated in the datasheet, and the 90 °C column shall be used only as the starting value for correction and adjustment, with the corrected ampacity limited to the value of the termination temperature column, in accordance with NFPA 70 110.14(C).
Service Conductor Termination Temperature Ratingrange
°C
607590
NOTE The temperature rating of the lowest-rated termination on the run, the meter socket, the current transformer cabinet, the line-side splice, or the service disconnect, is the rating that governs, and 75 °C is the marking on nearly every meter socket and service disconnect above 100 A; a 60 °C basis applies to a small service whose socket or disconnect is marked for 60 °C, and a 90 °C basis is claimed only where every termination on the run is marked for 90 °C, which few service equipment listings are. (6.4.2)
6.4.3 The Contractor shall verify the termination temperature marking of the meter socket, the current transformer cabinet, and the service disconnect before the service conductors are ordered, and shall report a marking lower than the datasheet value to the Engineer of Record in writing before ordering.

6.5 Line-Side Splices and Terminations

6.5.1 Service conductor terminations and splices shall be made as the Connectors and Terminations section of Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables requires, with the additional requirements of this article.
6.5.2 Where Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance permits a splice or a tap in the service conductors, the connector shall be of the type indicated in the datasheet.
Service Conductor Splice and Tap Connectorselect
Compression splice with a listed insulating cover
Insulated mechanical multi-tap connector
Listed sealed underground splice kit
NOTE A compression splice crimped with the listed die and covered with a heat-shrink or molded cover makes a permanent joint with the lowest resistance and is what a splice inside a wireway or a pull box takes; an insulated mechanical multi-tap connector takes several conductors of a range of sizes under set screws in an insulated block and is what a tap to grouped disconnects or a transition between conductor sizes takes, at the cost of a torque check; a sealed underground splice kit listed under UL 486D is the only connector that serves a splice in a handhole or a direct-buried run, where the joint sits in water. (6.5.3)
6.5.4 Each line-side connector shall be installed with the die, the crimp count, and the tooling the connector's listing requires for a compression connector, or torqued to the published value with a calibrated tool for a mechanical connector, and each shall be insulated to the full voltage rating of the conductor before the enclosure is closed.
6.5.5 The service conductors shall land in the service equipment on the lugs that equipment furnishes under its product standard, and where the conductor size or count exceeds the range of those lugs the Contractor shall report the mismatch to the Engineer of Record in writing before the equipment is released for manufacture, rather than reduce the conductor to fit.
NOTE A conductor forced into a lug below its size range, or two conductors landed in a lug listed for one, is a termination that is not listed, and it is the one the infrared survey finds in the first summer; the lug range is fixed when the equipment is ordered, so the conductor size and the lug range are reconciled on the submittals, not in the field. (6.5.6)

7 Feeder Sizing and Protection

7.1 Feeder Calculated Load

7.1.1 Each feeder shall be sized to the calculated load determined under NFPA 70 Article 220, applying the demand factors that article permits for the loads the feeder serves.
7.1.2 The calculated load, the overcurrent device rating, the conductor size, and the number of conductors per phase of each feeder shall be as indicated on the feeder schedule.
7.1.3 Each feeder shall have an ampacity, after the correction and adjustment factors applied under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables, not less than the noncontinuous load plus 125 % of the continuous load, in accordance with NFPA 70 215.2(A)(1), except that where the feeder overcurrent device and its assembly are listed for operation at 100 % of their rating the feeder may be sized at 100 % of the continuous load plus the noncontinuous load.
NOTE The 125 % factor on the continuous load exists to keep an ordinary molded-case device, which is tested to carry its rating in open air, from tripping on heat inside an enclosure under a three-hour load; a device listed for 100 % operation has been tested in the assembly it is installed in, and the factor is already in the listing. (7.1.4)
7.1.5 A feeder supplying a crane or hoist runway disconnecting means shall have an ampacity not less than NFPA 70 610.14(E) establishes for the motors it supplies, with the demand factors that section permits, and its overcurrent protection shall be as NFPA 70 610.41 requires; the runway conductors and everything on the load side of the runway disconnect are under Overhead Material HandlingOverhead Cranes and HoistsResolves to the current adopted revision.sync/overhead-material-handling.
7.1.6 A feeder to a separate building or structure shall comply with NFPA 70 Article 225 for its disconnecting means at the structure and for the single feeder NFPA 70 225.30 permits, and the grounding electrode and the equipment grounding conductor at the structure shall be as Grounding And BondingGrounding and Bonding for Electrical SystemsResolves to the current adopted revision.sync/grounding-and-bonding requires.

7.2 Feeder Overcurrent Protection

7.2.1 Each feeder shall be protected at its ampacity, after correction and adjustment, by the overcurrent device at its supply end, in accordance with NFPA 70 240.4.
7.2.2 Where the feeder ampacity does not correspond to a standard overcurrent device rating, the next higher standard rating may protect the feeder only where that rating does not exceed 800 A, in accordance with NFPA 70 240.4(B).
7.2.3 Where the overcurrent device is rated above 800 A, the feeder ampacity shall be not less than the rating of the device, in accordance with NFPA 70 240.4(C).
NOTE The rating and the settings of each feeder overcurrent device are established under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study, and this standard sizes the feeder to carry what that device lets through; a feeder whose ampacity falls short of a device setting changed during the study is the coordination that was never checked against the conductor. (7.2.4)

7.3 Largest Single Conductor

7.3.1 The largest single conductor size used for a service or a feeder before the conductors are installed in parallel shall be as indicated in the datasheet.
Largest Single Conductor Sizeselect
350 kcmil
500 kcmil
600 kcmil
750 kcmil
1000 kcmil
NOTE A conductor above 500 kcmil gains little ampacity for its added copper, because the current crowds toward the surface of a large conductor, and it is stiff enough that a 750 kcmil or 1000 kcmil conductor needs a larger pull box, a larger bending radius, and a lug that most distribution equipment does not furnish as standard; 500 kcmil is the size most equipment lugs accept and most contractors keep on hand, 350 kcmil suits a project that wants lighter pulls at the cost of more parallel sets, and 600 kcmil and above suit a project with few raceways available and equipment ordered with lugs to match. (7.3.2)
7.3.3 Where the one-line diagram or the feeder schedule shows a single conductor larger than the datasheet value, the schedule shall govern for that run.

7.4 Parallel Conductor Sets

7.4.1 Service conductors and feeders installed in parallel shall comply with NFPA 70 310.10(G) and with the Parallel Conductors article of Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables, and the number of sets of each run shall be as indicated on the feeder schedule.
7.4.2 Where a parallel set is installed in more than one raceway or cable, each raceway or cable shall carry the arrangement of conductors indicated in the datasheet.
Parallel Set Raceway Arrangementradio
● One conductor of each phase and the neutral in each raceway
○ Isolated-phase arrangement in nonmetallic underground raceways
NOTE Running one conductor of each phase and the neutral in each raceway keeps the magnetic fields of the set balanced inside every raceway, which NFPA 70 300.3(B)(1) and 300.20 require in a ferrous raceway and which keeps every raceway of the set at the same impedance so the conductors share current; an isolated-phase arrangement, with all the conductors of one phase in one raceway, is permitted only in nonmetallic raceways run underground as NFPA 70 300.3(B)(1) Exception No. 2 and 300.5(I) Exception No. 2 provide, and it suits a long underground duct bank where it simplifies the pull, at the cost of unequal reactance between phases and of a raceway that is never converted to metal. (7.4.3)
7.4.4 Where an isolated-phase arrangement is selected, the raceways shall be nonmetallic, shall be run underground, and shall be installed in close proximity to one another as NFPA 70 300.5(I) Exception No. 2 requires, and the metal enclosure each raceway enters shall be arranged as NFPA 70 300.20(B) requires.
7.4.5 The conductors of each phase and of the neutral in a parallel set shall be cut to the same length, and the Contractor shall measure and record the installed length of each conductor of each set.
7.4.6 Where the conductors of a parallel set terminate at equipment, each conductor of the set shall land on its own lug or on a lug listed for the number of conductors it holds, and the conductors of one phase shall not be stacked on a lug listed for one.
NOTE A parallel set shares current by impedance, and the impedance of each conductor is its length; a set whose conductors differ by a few feet in a short run divides its current unevenly, and the shorter conductor carries more than its share and runs hotter, which is why the length is measured and recorded rather than assumed from the raceway length. (7.4.7)

7.5 Feeder Neutral Sizing

7.5.1 The grounded conductor of each feeder shall be sized on the basis indicated in the datasheet, and shall be not smaller than the equipment grounding conductor NFPA 70 250.122 requires for the feeder overcurrent device, in accordance with NFPA 70 215.2(A)(2).
Feeder Neutral Sizing Basisradio
● Full size, equal to the phase conductors
○ Reduced to the maximum unbalanced load under NFPA 70 220.61
○ Oversized to 200 % of the phase conductor ampacity
NOTE A full-size neutral costs one more conductor at the phase size and never has to be revisited when the load changes, which is why most projects carry it on every feeder; a neutral reduced to the unbalanced load under NFPA 70 220.61 saves copper on a feeder whose load is balanced three-phase equipment, and the reduction is lost the day a nonlinear load is added, since 220.61(C) forbids it where the load is largely nonlinear; a 200 % neutral serves a feeder to a panelboard whose load is electronic, where the third-harmonic currents of the three phases add in the neutral rather than cancel, and it is paired with the 200 % neutral bus selected under PanelboardsPanelboardsResolves to the current adopted revision.sync/panelboards. (7.5.2)
7.5.3 Where the feeder serves a load that is more than half nonlinear, the neutral shall not be reduced below the phase conductor size, and the neutral shall be counted as a current-carrying conductor for the adjustment factors applied under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables.
7.5.4 Where a 200 % neutral is selected, the neutral shall be two conductors of the phase size in parallel or one conductor of twice the phase ampacity, and the neutral lug of the equipment at each end shall be listed for the conductor furnished.

7.6 Feeder Voltage Drop

7.6.1 Each feeder shall be sized so that the voltage drop from its supply end to its load end, at the calculated load and at the operating temperature of the conductor, does not exceed the value indicated in the datasheet.
Feeder Voltage Droprange
Not more than
%
11.522.5345
7.6.2 Where Adopted Energy CodeAdopted Energy CodeParameterEach project supplies its own value.adopted-energy-code limits the voltage drop of a feeder to a lower value than the datasheet, the lower value shall govern.
NOTE NFPA 70 215.2(A) carries an informational note that a feeder voltage drop of 3 % and a combined feeder and branch circuit drop of 5 % provide reasonable efficiency of operation, and several editions of the energy code enforced 2 % on feeders and 3 % on branch circuits as a requirement; a tighter feeder criterion buys motor starting torque and steady voltage at electronic loads at the cost of a larger conductor on every long feeder, and a looser one is accepted on a short feeder to a lighting load whose voltage the drivers tolerate. (7.6.3)
NOTE The combined feeder and branch circuit voltage drop criterion is selected under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables, and the feeder criterion here is the portion of that total the feeder is allowed to consume. (7.6.4)

7.7 Feeder Taps and Transformer Secondary Conductors

7.7.1 Whether feeder conductors may be tapped under the tap rules of NFPA 70 240.21(B) shall be as indicated in the datasheet.
Feeder Tap Rule Useradio
● Taps permitted under NFPA 70 240.21(B)
○ Taps not permitted
7.7.2 Where taps are permitted, a tap shall be made only where the one-line diagram shows it, and where taps are not permitted every feeder shall be protected at its ampacity at its supply end.
NOTE A tap lets one feeder device serve several pieces of equipment through short unprotected conductors, which removes a device and an enclosure from every tap and is how a transformer, a gutter feeding grouped disconnects, and a motor control center lineup are commonly supplied; forbidding taps puts a device at the head of every conductor, which costs devices and space and is what an Owner chooses when its maintenance staff want every conductor protected at its source and no length of feeder that relies on a device ten times its ampacity. (7.7.3)
7.7.4 Where a tap is made, the tap conductors shall comply with one of the rules of NFPA 70 240.21(B) for their length, their ampacity relative to the feeder device, and their termination in a single overcurrent device, and the rule applied shall be stated on the tap schedule submitted.
7.7.5 Tap conductors shall be enclosed in a raceway or an enclosure for their whole length, shall not supply another tap, and shall terminate in a single overcurrent device that limits the load to the tap conductor ampacity.
7.7.6 Conductors from the secondary of a transformer to the first overcurrent device shall comply with NFPA 70 240.21(C) for their length and their ampacity relative to the primary device, and the secondary conductors of a transformer with a single-phase two-wire or a three-phase delta-delta secondary may be protected by the primary device only as NFPA 70 240.21(C)(1) permits.
7.7.7 Where the tap or the transformer secondary conductors are indicated on the one-line diagram, their size, length, and the device they terminate in shall be as indicated on the one-line diagram.

8 Testing

8.1 Service Conductor Insulation Resistance

8.1.1 Before the service conductors are connected at the service point and before they are landed in the service equipment, each service conductor shall be tested for insulation resistance with a direct-current test set, each conductor against ground with the other conductors of the set grounded, and each conductor against each other conductor, at the test voltage indicated in the datasheet applied for not less than one minute.
Service Conductor Insulation Resistance Test Voltagerange
V dc
50010002500
8.1.2 The insulation resistance of each service conductor, corrected to 20 °C, shall be not less than the value indicated in the datasheet.
Service Conductor Insulation Resistancerange
Not less than
MΩ
501002505001000
NOTE ANSI/NETA ATS Table 100.1 assigns 1000 V dc and a 100 MΩ minimum to 600 V class conductors, and a 500 V dc test at the same minimum serves a conductor whose attached equipment the tester cannot isolate; the 2500 V dc setpoint serves a 1000 V rated conductor or an Owner that wants a stressed test of a long underground service, and the higher minimum values suit a new conductor in a dry raceway, where a reading near 100 MΩ on a short run is already a sign of moisture or damage. (8.1.3)
8.1.4 A service conductor that fails the insulation resistance test shall not be connected, the Contractor shall locate the cause and replace the conductor or the set, and the cost of the replacement and of every repeated test shall be borne by the Contractor.
NOTE The test is performed before the conductors are connected because once they are landed on the utility's terminals and the service disconnect, the premises side can no longer be isolated without the utility, and a defect found then costs an outage; Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance holds the service from the utility's connection until this test is recorded. (8.1.5)

8.2 Feeder and Parallel Set Tests

8.2.1 The feeders and the parallel sets within this standard shall receive the tests indicated in the datasheet, in addition to the insulation resistance and continuity tests of the conductor product performed under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables.
Service and Feeder Acceptance Testscheckbox
☑ Phase identification and continuity of each service conductor set from the service point to the service disconnect
☑ Current balance across the conductors of each parallel set under load
☐ Neutral current of each feeder serving nonlinear load under load
☑ Phase rotation at the load end of each three-phase feeder
8.2.2 Where the current balance test is selected, the current in each conductor of a parallel set shall be measured with the feeder carrying not less than 50 % of its calculated load, and the current in any conductor shall not differ from the average of the conductors of that phase by more than the value indicated in the datasheet.
Parallel Set Current Balance Tolerancerange
Not more than
%
5101520
NOTE A parallel set whose conductors are cut to the same length and terminated alike shares current within a few percent, and a conductor that carries noticeably more than its share is the one with a loose termination, a shorter length, or a different route; the tolerance is set to catch those without failing a set for the small differences that lug resistance alone produces, and a tighter tolerance suits a set near its ampacity where any imbalance leaves one conductor overloaded. (8.2.3)
8.2.4 A parallel set whose current balance exceeds the tolerance shall not be accepted until the Contractor has found and corrected the cause and repeated the test, and the cost of the correction and of every repeated test shall be borne by the Contractor.
8.2.5 Where the neutral current test is selected, the neutral current of each feeder serving nonlinear load shall be measured with a true-rms instrument under the load in place at the time of the test, and shall be recorded with the phase currents and the load condition.
8.2.6 The testing organization, its instruments, the safety practice, the deficiency process, and the compiled report shall be as Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing requires, and the tests of this standard shall be recorded in that report.

9 Installation

9.1 Service Conductor Installation

9.1.1 Service conductors shall be pulled, trained, supported, and terminated as the Installation section of Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables requires for feeders, with the additional requirements of this article.
9.1.2 Service conductors shall be pulled only after the service raceway has been proved clear and sealed as Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance requires, and the conductors shall not be pulled through a raceway that is open to the weather or that stands in water at the time of the pull.
9.1.3 Service conductors shall be installed without a splice or a tap except where Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance permits one, and each permitted splice shall be made with the connector selected under the Line-Side Splices and Terminations article.
9.1.4 Service conductors at the service head shall extend the length Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance requires for the utility's splice, and service conductors at an underground service point shall extend the length the serving utility's requirements state for its terminations.
9.1.5 Where parallel sets of service conductors enter the service equipment, the conductors of each set shall be trained to their lugs with the same bending radius and the same length within the enclosure, and no conductor of the set shall be looped to take up a length difference.

9.2 Vertical Runs

9.2.1 Service conductors and feeders in a vertical raceway shall be supported at the top of the raceway and at intervals not exceeding those NFPA 70 Table 300.19(A) states for the conductor size and material, by a support method that NFPA 70 300.19(B) recognizes.
NOTE A conductor hanging in a riser carries its own weight on the termination at the top unless it is supported, and a large conductor in a tall riser weighs enough to pull out of a lug or to deform its insulation at the top bushing; the table intervals shorten as the conductor grows for that reason. (9.2.2)

9.3 Feeder Installation

9.3.1 Each feeder shall be installed with all of its conductors, the phases, the neutral, and the equipment grounding conductor, in the same raceway or cable, except as the Parallel Conductor Sets article permits for a parallel set in more than one raceway, in accordance with NFPA 70 300.3(B).
9.3.2 Where a feeder is installed in a ferrous raceway or enters a ferrous enclosure, all of the conductors of the feeder, or one of each phase and the neutral of each parallel set, shall pass through the same raceway and the same enclosure opening, in accordance with NFPA 70 300.20.
9.3.3 Each feeder shall be identified at its supply end and its load end with the feeder designation shown on the feeder schedule, with the label furnished under Electrical IdentificationWiring System IdentificationResolves to the current adopted revision.sync/electrical-identification.

10 Delivery, Storage, and Handling

10.1 Service conductors and cables shall be delivered, stored, inspected at receipt, and handled as Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables requires for feeders, and the ends of every service conductor on a reel and at every interruption of a pull shall be sealed against moisture.
10.2 A reel of service conductor or cable with damaged insulation or wetted ends shall be set aside, and the affected length shall be cut out and removed or the reel replaced, at the Contractor's cost, before any of it is installed.

11 Warranty

11.1 The Contractor shall warrant the service conductors, the parallel sets, the taps, and the transformer secondary conductors, including every splice and termination made under this standard, under the same terms and for the same period as the feeder conductor installation is warranted under Conductors And CablesConductors and CablesResolves to the current adopted revision.sync/conductors-and-cables.
11.2 A service conductor or a parallel set replaced under warranty shall be retested as the Testing section requires before it is reconnected, and shall be warranted for the remainder of the original period or for one year from the date of replacement, whichever ends later.
11.3 Where the parties disagree whether a warranty-period failure of a termination results from workmanship, from the connector, or from a load the feeder was not sized for, the Engineer of Record shall make the initial determination.

SynC Standards are reference material provided for informational purposes only and as a guide. They are not engineering, architectural, or legal advice and are not a substitute for the judgment of a licensed design professional. It is the responsibility of the user to determine the applicability of any standard to a specific project and to verify all requirements against the governing codes, manufacturer data, and project conditions. SynC does not render professional services and forms no professional relationship by publishing this content. Provided "as is," without warranty of any kind, including fitness for a particular purpose. See our Terms of Use for the complete terms. Moderation log.

This standard is written and maintained by SynC and licensed under Creative Commons Attribution 4.0. You may share and adapt it, including commercially, provided you credit SynC Standards, link to the license, and indicate any changes. Each standard is drafted from cited sources under published authoring rules, reviewed before adoption, and corrected in the open. Keep the attribution and notice below with any copy; it carries the warranty notice the license asks you to retain.

Attribution and reuse notice. Keep this with any copy:
"Service and Feeder Conductors," SynC Standards, revision 3. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Source: https://synergyinconstruction.com/standards/general/distribution-feeder-cables. Reference material only; not professional engineering advice and provided without warranty. Verify against governing codes and have a licensed professional review before use.