Revision 4 · Oct 12, 2026 +11 −1

Datasheet constraints: every range, checkbox and listbox field now states its direction
Showing changes from Rev 3 to Rev 4 in Electrical Acceptance Testing.
---
title: Electrical Acceptance Testing
…81 unchanged lines
- "Test instrument list with calibration dates"
- "Electrical safety procedures for the testing work"
+constraint: all_of
```
…24 unchanged lines
- "Deficiency notices within one working day"
- "Instrument calibration certificates"
+constraint: all_of
```
…24 unchanged lines
- "As-left protective device settings record"
- "Energization release records"
+constraint: all_of
```
…101 unchanged lines
- "Surge protective devices"
- "Power factor correction capacitors"
+constraint: all_of
```
…24 unchanged lines
- "Excitation and burden tests of current transformers"
- "Watts-loss test of surge arresters"
+constraint: all_of
```
…197 unchanged lines
max: 1200
setpoints: [100, 150, 225, 250, 400, 600, 800, 1000, 1200]
+constraint: exact
```
…118 unchanged lines
```datasheet
−label: Infrared Survey Minimum Load
+label: Infrared Survey Load
type: range
unit: '%'
…3 unchanged lines
setpoints: [10, 20, 30, 40, 50, 60]
default: 40
+constraint: min
```
…34 unchanged lines
default:
- "Searchable electronic PDF with the field data sheets"
+constraint: all_of
```
…12 unchanged lines
- "Owner"
- "Engineer of Record"
+constraint: all_of
```
…8 unchanged lines
max: 60
setpoints: [7, 14, 21, 30, 45, 60]
+constraint: max
```
…23 unchanged lines
## Where a test performed under this standard is later shown to have been performed with an uncalibrated instrument, at a voltage other than the one this standard assigns, or against a criterion other than the governing one, the testing organization shall repeat the test at no cost to the Owner, and where the equipment has since been energized, shall perform it at the next outage the Owner makes available.