SynC · Revision history
Revision history: Instrumentation and Control Cable
-
Rev 2 · Oct 17, 2026
P1 batch 4: hazardous-location installations, document confidentiality and AI use, generator paralleling switchgear, interrupter switchgear, medium-voltage drives and metal-enclosed bus now owned; bare-text mentions re-pointed to the new standards
-
Rev 1 · Oct 12, 2026
Initial publication