Building Thermal Insulation

Revision 5 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 12, 2026 +3 −3

Fix cross-reference library prefix syncs/ -> sync/
Showing changes from Rev 4 to Rev 5 in Building Thermal Insulation.
---
title: Building Thermal Insulation
27 unchanged lines
## Duct insulation within the building envelope shall be coordinated with [[sync/hvac-ductwork]].
## Where a separate fluid-applied air barrier membrane is used in conjunction with continuous insulation sheathing, the work shall be coordinated with [[sync/fluid-applied-air-barrier]].
+## Where a separate fluid-applied air barrier membrane is used in conjunction with continuous insulation sheathing, the work shall be coordinated with [[sync/air-barriers]].
# Referenced Standards {toc}
657 unchanged lines
options:
- "SPF serves as combined insulation, vapor retarder, and air barrier"
- "Separate house wrap or fluid-applied air barrier — see [[sync/fluid-applied-air-barrier]]"
+ - "Separate house wrap or fluid-applied air barrier"
- "Interior vapor barrier (polyethylene sheet) sealed to framing as air barrier and vapor retarder"
- "Continuous rigid board insulation with taped joints as air barrier layer"
default: "Separate house wrap or fluid-applied air barrier — see [[sync/fluid-applied-air-barrier]]"
+default: "Separate house wrap or fluid-applied air barrier"
```
518 unchanged lines
### This energy code compliance documentation is required for certificate of occupancy in many jurisdictions and shall be treated as a contract deliverable.

View current revision