Gypsum Board Assemblies

Revision 4 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 11, 2026 +0 −1

Migrate datasheet deferrals to drawing_ref + default: deferred
Showing changes from Rev 3 to Rev 4 in Gypsum Board Assemblies.
Tag changes −Acoustic Treatment−Architectural−Ceilings−Fire Barriers−Framing−Multi-Family Residential−Partitions
---
title: Gypsum Board Assemblies
938 unchanged lines
- "Aggregate spray (specify aggregate size)"
- "Skip trowel"
- "Other — see drawings"
drawing_ref: true
default: "None — smooth finish"
243 unchanged lines
### The Contractor shall document any conditions observed during installation that may affect the performance or durability of the gypsum board system — such as evidence of water infiltration, inadequate climate control during installation, or structural irregularities — and shall bring them to the Architect's attention before completing the work.