Gypsum Board Assemblies
Adoption-parse fixes (YAML quoting, valid types, range defaults/min-max)
Showing changes from Rev 4
to Rev 5
in Gypsum Board Assemblies.
---
title: Gypsum Board Assemblies
…1099 unchanged lines
max: 2500
step: 500
−default: 2500
+default: 2400
```
…81 unchanged lines
### The Contractor shall document any conditions observed during installation that may affect the performance or durability of the gypsum board system — such as evidence of water infiltration, inadequate climate control during installation, or structural irregularities — and shall bring them to the Architect's attention before completing the work.