Gypsum Board Assemblies
Revision 5
· Jun 18, 2026
+1
−1
SynC Standards Team — Specifier (Platform Standards) ✓ OfficialDiscloses employment SynC (SynC Platform Team)
Adoption-parse fixes (YAML quoting, valid types, range defaults/min-max)
---
title: Gypsum Board Assemblies
…1099 unchanged lines
max: 2500
step: 500
−default: 2500
+default: 2400
```
…81 unchanged lines
### The Contractor shall document any conditions observed during installation that may affect the performance or durability of the gypsum board system — such as evidence of water infiltration, inadequate climate control during installation, or structural irregularities — and shall bring them to the Architect's attention before completing the work.
View current revision